Laserfiche WebLink
All water samples for arsenic analysis will be stored in plastic bottles and <br /> will be preserved with nitric acid (HNO ) to a pH 2. These samples will be <br /> analyzed within the prescribed holding time. <br /> 12. Schedule <br /> A tentative schedule, in terms of elapsed time, is attached. As shown <br /> therein, the total length of this project is estimated to be 11 months. The <br /> total length of the onsite experimental phase is estimated to be 10 weeks. <br /> Allowing for pilot plant construction and post-testing demobilization, the <br /> i:otdl time onsite is estimated to be 16 weeks. <br /> 13. Waste Disposal <br /> All hazardous waste generated will be turned over to SHAD for proper disposal . <br /> 4 <br />