My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1988-1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1988-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:14:45 PM
Creation date
4/7/2020 2:36:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1988-1991
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w �r <br /> .Heays <br /> Reference COMMENTS • ;I <br /> 1. 20 The term site is too inclusive. The "any other areas bontailnihatel <br /> by the migration of a hazardous substance, pollutant o contaiminat <br /> from the depot: conceivably includes a very large area <br /> e2 . 2 If the Department of Defense were to sell part of Shar s , they woul <br /> continue to be responsible. What if lands considered to be part of <br /> the Site are sold? Some security, that rights of access be main- <br /> tained and continued with the new owner, should also be provided <br /> for in this Agreement. <br /> 10 . 2 "The final selection of remedial action by the Administrator shall <br /> not be subject to dispute in accordance with Section l , Resolution <br /> of Disputes . " The final selection of remedial action (E' ) must be <br /> unanimous and thus should be subject to dispute resolution. <br /> 12 . 3 . 2 The "draft final documents for the primary documents" should be <br /> available for public comment for the minimum length of time that <br /> the Parties have available . This will hasten the completion of the <br /> final documents , in accordance with Subsection 5 . 27 of the Agreement <br /> 12 . 8 . 2 "When dispute resolution is invoked on a draft final primary <br /> document, work may be stopped in accordance with the procedures <br /> set forth in Subsection 13 . 9 regarding dispute resolution. " 13 . 9 <br /> states that responsibility for timely performance of work is <br /> required unless an extension is granted. Work continues , though <br /> time may be consumed as a result of the dispute . Work iay only <br /> stop at the request of a DRC member and for the protect-on of <br /> human health , as stated in Subsection 13 . 10 . <br /> 14 .0 The phrase "or any other circumstance or activities , . creating a <br /> danger to the health or welfare of the people on the Site or in the <br /> surrounding area or to the envirommnet . " should not stoo further <br /> progress of the Agreement. "Other activities " that cre to a danger <br /> should be stopped to abate the danger; without having tae associatic <br /> with other work done pursuant to this Agreement. <br /> The Statement "In complying with any request under this Section <br /> SHAD shall not be liable for failure to comply with oth r Sections <br /> Of this Agreement affected by the request. " should not be included <br /> in this Agreement. The point of Section 14 (PR0TECTION F THE PUBLIC <br /> is lost. <br /> 17 . 5 The requirement that SHAD' s Project Manager be physically present <br /> or reasonably available to supervise work is unreasonable . SHAD ' s <br /> Project Manager or Representative be present or available is a <br /> more reasonable requirement. <br /> The Project Manager of the other Parties are not required to be <br /> hresent for work to be allowed. There should be inculd �d with this <br /> Agreement a stipulation as to how often these Project M nager are <br /> to be present. <br />
The URL can be used to link to this page
Your browser does not support the video tag.