My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> (5) May 15, 1992 - Sharpe' s Groundwater Treatment System Discharge, <br /> NPDES Permit Monthly Report for the month of April 1992. <br /> (6) June 12, 1992 - Sharpe' s Groundwater Treatment System Discharge, <br /> NPDES Permit Monthly Report for the month of May 1992. <br /> (7) June 15, 1992 - Sharpe' s Groundwater Contour Maps and Analysis <br /> for 4th Quarter of 1991. <br /> (8) June 4, 1992 - Draft Groundwater Treatment Remedial Design <br /> Statement of Work. <br /> b. Meetings with Regulatory Agencies: <br /> (1) April 10, 1992 - San Joaquin Valley Unified Air Pollution Control <br /> District, San Joaquin County Zone Hearing. Requested variance from permit <br /> requirements for pilot insitu vapor extraction system. Variance was granted. <br /> (2) April 22, 1992 - Project Manager' s conference call. <br /> (3) May 7, 1992 - Project Manager' s Meeting at DDRW Sharpe Facility. <br /> c. Other RI/FS Activities: <br /> (1) April 1992 - Completed short term injection tests. Extended test <br /> postponed until after analysis of North Balloon Groundwater Treatment System <br /> for PCB's and metals. <br /> (2) April/May 1992 Environmental Science and Engineering (ESE) took <br /> Groundwater Treatment System samples and analyzed for PCB and metals. <br /> Extraction wells and various monitoring wells near or down gradient of UST <br /> monitoring well M472A were also sampled. <br /> (3) April 28, 1992 - California Regional Water Quality Control Board <br /> performed Groundwater Treatment System and Sewage Treatment System Permits <br /> inspection. Samples were taken at both Groundwater Treatment Systems and <br /> analyzed for VOCs, PCBs, pesticides, and heavy metals. <br /> 5. REMEDIAL REMOVAL AND INVESTIGATION ACTIVITIES: Remedial and/or removal <br /> activities. <br /> a. The North and South Balloon Groundwater Treatment Systems continued <br /> to operate during this report period. More details on the operation of the <br /> system are included in the monthly NPDES Report. <br /> b. New extraction wells NB-5, NA-8, and NA-9 went into operation during <br /> the quarter. <br /> 6. REMEDIAL REMOVAL AND INVESTIGATION ACTIVITIES: Other Activities <br /> None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.