My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
SITE INFORMATION AND CORRESPONDENCE_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 2:59:29 PM
Creation date
4/7/2020 2:38:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1992
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. CAPTURE ZONE ANALYSIS <br /> Capture was evaluated for both the North and South Balloon Area Groundwater <br /> Treatment Systems. The average daily potentiometric data for the quarter was <br /> determined by averaging a minimum of one data point per month for each well . <br /> Plume extents (5 ppb) were drawn using the data from same quarter as <br /> potentiometric data. <br /> A-Zone <br /> Capture of Plume 1, A-Zone, in the South Balloon Area is almost complete. <br /> The northern edge of Plume 1 and Plume 3 are not being captured by South <br /> Balloon System. The Central Area System will include extraction well in this <br /> area (South End of Runway). The quantity of water being pumped from A-Zone <br /> has been going down due to the drop in water level. <br /> Capture of Plume 7 and 8, A-Zone, in the North Balloon area is almost <br /> complete. Additional extraction wells NA-8 and NA-9 have been added recently <br /> to capture the northern part of the plume. <br /> B-Zone <br /> Capture of Plum 1 , B-Zone, in the South Balloon Area is near complete. <br /> The northern edge of Plume 1 and Plume 3 will be captured by Central Area <br /> extraction well in this area (South End of Runway) . <br /> Capture of Plume 7 and 8, B-Zone, in the North Balloon area is nearly <br /> complete. New extraction well NB-5 went into operation during the month of <br /> April. There is noticeable difference when compared to last quarter' s maps. <br /> C-Zone <br /> Capture of Plume 1, C-Zone, in the South Balloon Area was almost <br /> complete. Extraction well C-3 was repaired in April. Continual pumping of <br /> these three wells will produce a better capture zone next quarter. <br /> Capture of Plume 7 and 8, C-Zone, in the North Balloon Area was not <br /> complete. New wells NC-2R and NC-3R went into operation during the first <br /> quarter. There is noticeable difference when compared to last quarter' s map. <br /> Larger pumps could be added to wells NB-1 , NB-2, and NB-3 which were drilled <br /> to 125 feet, 120 feet, and 121 feet, respectively. <br /> Agricultural Wells AGW-7 and AGW-6 <br /> Pumps at AGW-7 and AGW-6 have not been operated except for sampling since <br /> fall of 1991. There is still an indication capture zone type groundwater <br /> flows near these wells. <br />
The URL can be used to link to this page
Your browser does not support the video tag.