Laserfiche WebLink
the harmful chemicals in carbon filters. This controls at Sharpe protect the public and the <br /> treatment technique was successful, and SVE environment by restricting the way land is used. In <br /> systems are no longer used at the depot. areas where soil is contaminated, any activities (such <br /> as construction and demolition) that could disturb soil <br /> Sharpe continues to monitor for the presence of are carefully reviewed and then limited to prevent <br /> contamination. In addition, Sharpe uses human exposure to the disturbed soils. Sharpe's <br /> "institutional land use controls" to make sure there Chief of Environmental Management is required to <br /> will be no disturbance to a few sites on the depot conduct an annual inspection of sites where <br /> where contamination remains in place. Land use institutional land use control is in place. <br /> Summary of the Five-Year Review Report <br /> The Five Year Review Report will take a close look at • The groundwater extraction and treatment systems <br /> the environmental concerns and the treatment at Sharpe are in place and operating, and they will <br /> systems at Sharpe. The cleanup actions that have continue operation until cleanup goals are met. <br /> been accomplished will be reviewed, and the report However, Sharpe now expects that it will take <br /> will evaluate how well the cleanup systems are longer than originally thought to achieve <br /> working. The purpose of the report is to confirm groundwater cleanup goals. Sharpe strives to <br /> whether the cleanup actions and systems in place at identify and use the best cleanup methods as new <br /> the depot are protective of human health and the technologies become available; the actual length of <br /> environment. The report will also recommend ways the cleanup will depend on the effectiveness of the <br /> to maintain that protection. methods that are used. <br /> • All planned soil excavations are now complete at <br /> The final version of the Five-Year Review Report is Sharpe. The regulatory agencies (U.S. EPA, DTSC, <br /> scheduled to be published later this year. Some and CVRWQCB) have approved leaving some soils <br /> review activities have already been completed. contaminated with metals (lead and chromium) in <br /> Although final conclusions will not be available until place at the depot. These soils are under <br /> the final report is published, the review activities to institutional land use controls to protect the public <br /> date report the following: and the environment. Land use is monitored by the <br /> Chief of Environmental Management. <br /> is Sharpe has succeeded in meeting the criteria for <br /> "construction completion." This means that Sharpe Schedule for the Five-Year Review Report: <br /> has completed the physical construction of all The Final DDJC-Sharpe Five-Year Review Report is <br /> cleanup actions; has addressed all immediate currently scheduled for publication in September <br /> hazards to the environment; and has brought all 2003. ■ <br /> long-term hazards under control. Sharpe will <br /> continue to look for ways to better control the <br /> movement of TCE and PCE in groundwater. <br /> The Five-Year Review Report provides details <br /> (about DDJC-Sharpe's environmental program. <br /> Table 4-1. Remedial Actions for DDJC-Sharpe You can review <br /> Operable Year _---__ the report at <br /> Unit Type of Action Started Nature of Action Status <br /> I Groundwater 1987 Groundw:tcrcxt� fotnndtreatment Operating the depot's <br /> Treatment m South Balloon A ca Q 1 Information <br /> Groundwater 1990 Groundwater extraction and treatment Operating - ` I 't rr Repository <br /> Treatment in North Balloon Area ycarN°• (see back <br /> Groundwater 1995 Groundwater extinction and treatment Operating ' O <br /> Treatment in Central Arca { page)- <br /> 2 Soil Removal 1994 Removal of and in Pesticide Mix Area Completed Ei{{ <br /> Soil Vapor 1998 Soil vapor extracma at Sites P-1 A, Completed j <br /> Extraction P-I B,P-IC P-1 E,and P4A <br /> Soil Removal 1998 Removal of soil at Sites Sd and 5-26 Completed <br /> Institutional Controls 2001 Land use controls at South Balloon Implememed <br /> Area south of South Crane Way <br /> DDIC Defense Diori irlion Depot San Joaquin Culifarnis <br /> 3 <br />