Laserfiche WebLink
r <br /> 10. Section 4.4.2,Phase II - Percolation Pilot Study, Page 9: This section indicates that in <br /> preparation for the pilot test, soil will be scraped by backhoe or dozer to a depth of <br /> approximately 18 inches. Appendix C, page 7, indicates that the full-scale ponds will be <br /> below grade to a depth not to exceed 10 feet(bullet#2). The pilot test will be taking <br /> advantage of approximately 10 feet of additional soil percolation, which may not be <br /> representative of actual conditions in the proposed pond. Please provide justification as to <br /> the shallow pilot test data being representative of the deeper proposed full-scale <br /> percolation pond. <br /> 4 <br />