Laserfiche WebLink
- -'00% Remedial Design Aittals -2- 6 July 1993 <br /> DDRW. Sharpe <br /> excavation and removal of impacted soil prior to or during pond construction, <br /> and installation of one or more monitoring wells. <br /> If you have any qu tions, please call me at (916) 255-3065. <br /> JMES TAYLOR <br /> Associate Engineering Geologist <br /> JDT:jt <br /> cc: Ms. Catherine Johnson, U. S. Army Environmental Center, Aberdeen Proving <br /> Ground, Maryland <br /> CPT Mike Dell 'Orco, U. S. Army Corps of Engineers, Huntsville, Alabama <br /> Mr. Richard Seraydarian, U. S. Environmental Protection Agency, <br /> Region IX, San Francisco <br /> Ms. Tracie Billington, Department of Toxic Substances Control , Region 1, <br /> Sacramento <br /> Mr. Fred Kaufman, Public Health Services of San Joaquin County, <br /> Environmental Health Department, Stockton <br />