Laserfiche WebLink
30%/Draft Submittals -2- 4 May 1993 <br /> DDRW, Sharpe <br /> 4. The Draft Groundwater Monitoring Plan needs clarification on when and how <br /> monitoring proposed for the remedial design will be included with the <br /> ongoing monitoring of the North and South Balloon IRM systems to develope <br /> a comprehensive monitoring program for the final OU-1 Remedial Action. <br /> If you have any quest'ons, please call me at (916)255-3065. <br /> JJAS TAYLOR <br /> Associate Engineering Geologist <br /> JDT:jt <br /> Enclosures <br /> cc: Ms. Catherine Johnson, U. S. Army Environmental Center, Aberdeen Proving <br /> Ground, Maryland <br /> CPT Mike Dell 'Orco, U. S. Army Corps of Engineers, Huntsville, Alabama <br /> Mr. Richard Seraydarian, U. S. Environmental Protection Agency, <br /> Region IX, San Francisco <br /> Ms. Tracie Billington, Department of Toxic Substances Control , Region 1, <br /> Sacramento <br /> Mr. Fred Kaufman, Public Health Services of San Joaquin County, <br /> Environmental Health Department, Stockton <br />