Laserfiche WebLink
Ripon Unified School District <br /> TABLE OF CONTENTS <br /> Subpart A—Applicability, Definitions and General requirements for all <br /> Facilities and all types of Oil Products <br /> Introduction.....................................................................................................4 <br /> Engineering Certification 112.2(d)..........................................................................5 <br /> Location of SPCC Plan 112.3(e).............................................................................5 <br /> SPCC Plan Review 112.5(a)(b)..............................................................................6 <br /> Management Approval.........................................................................................6 <br /> 40 CFR 112.7 <br /> Cross References within the SPCC Rule 112.7............................................................7 <br /> Certification of Substantial Harm Determination 112.7..................................................7 <br /> Facility Information 112.7....................................................................................8 <br /> The Facility's Conformance 112.7(a)(1) & (2).............................................................9 <br /> Facility Maps, Drainage &Physical Layout of the Facility.............................................10 <br /> Fuel Delivery Instructions...................................................................................12 <br /> Discharge Prevention Measures 112.7(a)(3)(ii)..........................................................13 <br /> Discharge Drainage Control 112.7(a)(3)(iii).............................................................17 <br /> Countermeasures for Discharge Discovery, Response& Cleanup....................................18 <br /> Methods of Disposal of Recovered Materials 112.7(a)(3)(v)..........................................18 <br /> Contact List& Phone Numbers 112.7(a)(3)(vi)..........................................................19 <br /> Information to be Given to Contacts 112.7(a)(4)........................................................20 <br /> Procedures to Follow in the Event of a Discharge 112.7(a)(5)........................................21 <br /> Direction, Rate of Flow& Total Quantity of a Potential Discharge 112.7(b).......................22 <br /> Prevention Systems 112.7(c)...............................................................................23 <br /> If Measures in 40 CFR 112.7(c) are not Practicable 112.7(d).........................................24 <br /> Inspections, Tests& Records 112.7(e)...................................................................24 <br /> Personnel Training for Discharge Prevention Procedures 112.7(f)...................................25 <br /> Security112.7(g).............................................................................................26 <br /> Tank Truck Loading/Unloading Area Containment 112.7(h)..........................................27 <br /> Field Constructed Tanks 112.7(i)..........................................................................27 <br /> Conformance with Local, State & other Regulations & Guidelines 112.70)........................27 <br /> Qualified Oil-Filled Operational Equipment 112.7(k)..................................................27 <br /> Subpart B—Requirements for Petroleum Oils & Non Petroleum Oils 40 CFR 112.8 <br /> General Requirements 112.8(a).............................................................................28 <br /> Facility Drainage 112.8(b)(1) & (2)Diked Areas.......................................................28 <br /> Facility Drainage 112.8(b)(3) & (4)Undiked Areas....................................................28 <br /> 9�! <br /> 2 <br />