Laserfiche WebLink
Ripon Unified School District <br /> Attachment A <br /> Appendix B&C Reporting Form <br /> And Repair Log <br /> Inspection of the secondary cement containment area, drains, aboveground <br /> storage tank, the loading system area and the refueling area (as described in 40 CFR <br /> 112.7(a)(3)(iii) SPCC Plan). Make note of any discrepancies in any of the aforementioned <br /> items and report them immediately to the proper facility personnel. Similar requirements <br /> exist in 40 CFR 112.7(e). All repairs or corrective actions made shall be recorded in the <br /> following log: <br /> Secondary Containment Inspection Log for Tank, Piping, and <br /> Secondary Containment <br /> Date & Name, company, address <br /> Date of Description time of Description of repair or & phone number of person <br /> defect of defect repair remed . List parts replaced who performed repairs <br /> 33 <br />