My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJC-Sharpe EWCC3*ometer Installation Worc Plan <br /> • Name and signature of the field geologist 4.0 PIEZOMETER MATERIALS <br /> preparing the log; and <br /> 4.1 Piezometer Casing <br /> • Name and signature of California registered <br /> geologist who provided oversight. The piezometer casing will be 2-inch inside <br /> diameter Schedule 80 polyvinyl chloride(P C) <br /> 2.2.2 During the construction of each piezome- pipe with flush threads.During installation,PVC <br /> ter,an as-built diagram of each piezometer nest spacers(see Attachment A design drawing)will <br /> will be recorded by the field geologist. Further- be placed between the three piezometers an <br /> more,a detailed log will be kept during the affixed with plastic ties; these will assure that <br /> development of each piezometer.The type of the PVC casing will be separated during in alla- <br /> information that shall be included in each of tion of the filter pack, bentonite seal, and grout. <br /> these logs is discussed in the DDJC-Sharpe/ The casing surface will be free of solvents, ils, <br /> Tracy Comprehensive Field Work Plan (URS, grease,paint, and dirt and will be certified clean <br /> 2001b). from the factory or steam-cleaned on site prior <br /> to installation. Sections of casing will be <br /> 2.3 Drilling Requirements received from the supplier wrapped in polyethy- <br /> lene protective wrappers with sealed ends i <br /> For all three proposed piezometer nests, 12-inch order to limit exposure to potential contami <br /> diameter borings will be drilled using a mud nants. Casing will not be removed from the <br /> rotary drilling rig;continuous core for lithologic wrapping until immediately before it is to b <br /> logging will be obtained through the targeted placed in the boring. <br /> sand zones.Mud rotary drilling is preferable <br /> over hollow-stem auger drilling at depths 4.2 Piezometer Screen <br /> exceeding 100 feet bgs due to the potential for <br /> heaving sands and the difficulty in controlling Each piezometer screen will be 2-inch insid <br /> these sands using augers. Upon completion of diameter,continuous slot Schedule 80 PVC with <br /> drilling and logging, three 2-inch diameter flush threads. All screen openings will widen <br /> piezometers will be installed at different depth inward so as to be non-clogging. The slot si re <br /> intervals within each boring(i.e., in sandy zones will be compatible with the filter pack that will <br /> at approximately 110 to 120 feet bgs, 125 to 135 surround the screen; slot size and filter pacli will <br /> feet bgs [EWCC3 interval], and 160 to 170 feet be determined based on pilot boring litholo ies. <br /> bgs). Additional detail regarding the mud rotary The piezometer screen will be of sufficient ize <br /> method of drilling is included in the DDJC- and design to hold back and support the flit r <br /> Sharpe/Tracy Comprehensive Field Work Plan pack and in situ soils surrounding the screen. <br /> (URS,2001b). The piezometer screen surface will be free f <br /> solvents, oils, grease,paint, and dirt and wi]1 be <br /> 3.0 PIEZOMETER certified clean from the factory or steam-cle ned <br /> SPECIFICATIONS on site prior to installation.The piezometer <br /> screen will have smooth, sharp-edged openi igs <br /> Each of the three nested piezometers will be free of burrs,chipped edges, or broken piec s on <br /> installed using the guidelines set forth in the the interior and exterior surfaces of the pipe <br /> DDJC-Sharpe/Tracy Comprehensive Field Work Sections of the screen will be received from the <br /> Plan(URS, 2001b). The estimated design speci- supplier wrapped in polyethylene protective <br /> fications of the proposed three piezometer nests wrappers with sealed ends in order to limit <br /> are shown in Table 3-1. A diagram of a typical exposure to potential contaminants. Wrapping <br /> groundwater piezometer nest design is included will not be removed until screen is to be use . <br /> in Attachment A to this work plan. <br /> KAI2200\Sharpe\EW CC3 Piez WP\EWCC3 WP.dm 3 Jul 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.