Laserfiche WebLink
DDJC-Sharpe EWCAtometer Installation Wor<Plan <br /> 5.0 POST-PIEZOMETER 5.4 Data Management <br /> INSTALLATION ACTIVITIES <br /> 5.4.1 All data collected from location sur y- <br /> 5.1 Piezometer Development ing, lithologic logging,piezometer construction, <br /> water level measurement, and groundwater <br /> Each piezometer will be developed after casing sample analyses under this task order will <br /> installation. Piezometer development procedures incorporated into the DDJC-Sharpe/Tracy <br /> will follow those outlined in the DDJC-Sharpe/ Environmental Data Management System <br /> Tracy Comprehensive Field Work Plan (URS, (EDMS)database. Data receipt,data loadin g, <br /> 2001b). Each piezometer will be swabbed and and data quality control will be pelformed under <br /> bailed to remove fine sand inside the piezometer a separate task order. <br /> casing; swabbing and bailing will continue until <br /> fine-grained sediment removed from the 5.4.2 Electronic versions of all documents(i.e., <br /> piezometer decreases to less than an estimated CD-ROMs)will be prepared and submitted <br /> volume of one ounce of sediment in one bailer according to the procedures described in the <br /> load. Piezometer development data recorded will Electronic Document Submittals (#RD-ST- 02) <br /> include field determinations of pH,temperature, for the DDJC-Sharpe/Tracy program. <br /> specific conductivity,turbidity data, the total <br /> number of well volumes purged from the 6.0 REFERENCES <br /> piezometer during development, and the average <br /> pumping rate during development. URS, 2001a. URS Memorandum,Recomm nda- <br /> tion for Monitoring Well Cluster and <br /> 5.2 Piezometer Location Surveying Piezometers on Private Properties Vest <br /> of DDJC-Sharpe. 17 December. <br /> The top of casing elevation will be measured for <br /> each of the nine newly installed piezometers URS, 2001b. DDJC- Sharpe/Tracy Compr en- <br /> (each of the nine piezometers will be assigned a sive Field Work Plan.February. <br /> unique identification number). Horizontal <br /> coordinates will be determined to the closest <br /> 1.0-foot and referenced to the State Plane <br /> Coordinate System,Zone 3,North American <br /> Datum of 1983. Ground and top of casing <br /> elevations to the closest 0.1-foot and 0.01-foot, <br /> respectively, will be obtained at each well. <br /> These elevations will be referenced to the <br /> National Geodetic Vertical Datum of 1988. <br /> 5.3 Groundwater Sample <br /> Collection <br /> Following piezometer development, water levels <br /> will be measured,and samples will be collected <br /> from the piezometers as required by the annual <br /> monitoring program. Sample collection will be <br /> performed in accordance with procedures <br /> outlined in the Comprehensive Field Work Plan <br /> (URS, 2001b). Samples will be analyzed for <br /> volatile organic compounds (U.S.Environ- <br /> mental Protection Agency [EPA] Method <br /> SW8260B). <br /> KAI 2200\Sharpe\EW CC3 Piez WP\EWCC3 WP.dm 5 July 2002 <br />