My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDIAcy OU 1 Pesticide Reme diation <br /> Groundwater Extraction Well Installation Work Plan <br /> Table 3-1. Estimated Well Specificationsa <br /> Estimated <br /> Estimated Casing Estimated Length of <br /> Boring Depth Diameter Casing Well Slot Well Screen <br /> ID (feet bgs) (inches Material Screen Material Size fee <br /> PEW-1 40 6 SCH 40 PVC #304 wire-wrapped 0.020 20 <br /> stainless steel <br /> PEW-2 40 6 SCH 40 PVC #304 wire-wrapped 0.020 20 <br /> stainless steel <br /> Well specifications are dependent on the lithology encountered during drilling. <br /> bgs = below ground surface <br /> PEW = proposed extraction well <br /> PVC = polyvinylchloride <br /> SCH = schedule <br /> 4.0 WELL MATERIALS the factory or steam cleaned on site prior t$ <br /> installation.The well screen will have smooth, <br /> 4.1 Well Casing sharp-edged openings free of burrs,chipped <br /> edges,or broken pieces on the interior and <br /> The well casing will be a 6-inch-diameter exterior surfaces of the pipe. Sections of the <br /> Schedule 40 polyvinyl chloride(PVC)pipe with screen will be received from the supplier <br /> flush threads.The casing surface will be free of wrapped in polyethylene protective wrappers <br /> solvents,oils, grease,paint, and dirt and will be with sealed ends to limit exposure to potential <br /> certified clean from the factory or steam cleaned contaminants.Wrapping will not be removed <br /> on site prior to installation. Sections of casing until the screen is to be used. <br /> will be received from the supplier wrapped in <br /> polyethylene protective wrappers with sealed 4.3 Filter Pack <br /> ends in order to limit exposure to potential <br /> contaminants. Casing will not be removed from The filter pack material will be composed f <br /> the wrapping until immediately before it is to be round,hard,water-wom siliceous sand anfree <br /> placed in the boring. of flat or elongated pieces,organic matter,or <br /> other foreign matter.All filter pack materi d will <br /> 4.2 Well Screen be protected from contamination prior to <br /> placement by either storing it in plastic-lin d <br /> The extraction well screen will be 6-inch paper bags or on plastic sheeting in a local on <br /> diameter, wire-wrapped, stainless steel with protected from the weather and contarnina'on. <br /> flush threads. All screen openings will widen All filter pack material will be placed in th <br /> inward so as to be non-clogging. The slot size annular space in the borehole by using a 2 inch <br /> will be compatible with the filter pack that will tremie pipe. Once the filter pack is in place,the <br /> surround the screen; slot size, and filter pack driller will develop the interval until no m asur- <br /> will be determined based on lithologies able decline in the filter pack is observed. <br /> described during borehole drilling. The well complete description of the guidelines to used <br /> screen will be of sufficient size and design to for the installation of filter pack material i <br /> hold back and support the filter pack and in situ presented in the DDJC-SharpelTracy Cont re- <br /> soils surrounding the screen.The well screen hensive Field Work Plan(URS, 2001). <br /> surface will be free of solvents,oils, grease, <br /> paint, and dirt and will be certified clean from <br /> KA02237\01J 1Pes1-RemUna1\GW-EW-WrkP1n.dcc 5 11y2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.