Laserfiche WebLink
• DDJC-Sharpe Permanen iiezometer Installation W rk Plan <br /> Addendum GMS Boundary Condition Verification <br /> investigation methods and standard operating • Data are consistent with project obj Ives; <br /> procedures are presented in Section 3.0. and <br /> 2.2 The objective of this work will be accomp- • Data are collected in a manner that w 11 <br /> lished through the implementation of the ensure accuracy,precision,completex ess, <br /> following activities: representativeness,and comparability. <br /> • Field inspection,marking,and documenta- 3.1.2 All CPT activities will conform totate <br /> tion of the proposed CPT locations; and other applicable regulatory requirem ts. <br /> All work shall be performed in accordance with <br /> • Review and coordination with the City of the DDJC-Sharpe/Tracy Comprehensive Field <br /> Lathrop, San Joaquin County Public Works, Work Plan Field Procedures(URS, 2001). The <br /> and Public Health Services,Environmental procedures for the work to be performed tinder <br /> Health Division,including preparation and this addendum are presented in the following <br /> submission of encroachment permits for sections of the Comprehensive Field Work Plan: <br /> work within the public road rights-of-way <br /> and well installation permits; • Location Surveying(Section 2.0); <br /> • Notification of Underground Service Alert • Cone Penetrometer Testing(Section 4.1); <br /> (USA)to obtain utility clearance of the <br /> planned CPT locations by the local utility • Groundwater Well/Piezometer Install tion <br /> companies or their representatives; (Section 5.0;also Section 3.2 of this work <br /> plan addendum); <br /> • CPT at each planned location, including <br /> dissipation testing to determine the depth to • Field Equipment Use and Calibration <br /> groundwater, and installation of permanent (Section 9.2); <br /> piezometers;and <br /> • Data Management(Section 11.0); and <br /> • Surveying by a licensed surveyor to digitize <br /> the location,top of casing elevation,and • Health and Safety(Section 12.0). <br /> ground surface elevation of each piezometer <br /> location. 3.2 Piezometer Materials <br /> 3.0 FIELD INVESTIGATION 3.2.1 The CPT drill rig will be used to co - <br /> PROCEDURES AND METHODS struct 1-inch outside diameter piezometers with <br /> the materials described in the following <br /> 3.1 Field Operations paragraphs. <br /> 3.1.1 The location and number piezometers 3.2.2 The piezometer casing will be 1-inc <br /> were selected in coordination with WES and outside diameter Schedule 40 polyvinyl ch oride <br /> based on location of temporary piezometers (PVC)pipe with flush threads.The casing <br /> installed in August and September 1998 for surface will be free of solvents,oils,greas , <br /> boundary verification for the groundwater paint,and dirt and will be certified clean f Din <br /> model. Attachment 1 shows the locations and the factory or steam-cleaned on site prior t <br /> groundwater elevation data of the temporary installation. Sections of casing will be received <br /> piezometers that were installed in August and from the supplier wrapped in polyethylene <br /> September 1998.The procedures presented in protective wrappers with sealed ends in order to <br /> this section are designed to ensure that: limit exposure to potential contaminants. Casing <br /> will not be removed from the wrapping until <br /> KA02238\Sharpe Piez WP\CPT addendum Sharpe.duc 3 Mar,h 20112 <br />