My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.3.2 Only the draft final documents for the primary documents iden- <br /> tified above shall be subject to dispute resolution. SHAD shall complete <br /> and transmit draft primary documents in accordance with the timetables and <br /> deadlines established in Attachment 2 to this Agreement. <br /> 12.4 Secondary Documents: <br /> 12.4.1 SHAD shall complete and transmit draft documents for the fol- <br /> lowing secondary documents to the other Parties for review and comment in <br /> accordance with the provisions of this Section: <br /> 1. Sample Plans <br /> 2. Well Closure Methods and Procedures <br /> 3. Baseline Risk Assessment <br /> 4. Quarterly Reports <br /> 12.4.2 Although EPA, DOHS, and RWQCB may comment on the draft docu- <br /> ments for the secondary documents listed above, such documents shall not be <br /> subject to dispute resolution except as provided by Subsection 12.2. Target <br /> dates for the completion and transmission of draft secondary documents which <br /> are not in Attachment 2 to this Agreement shall be established by the <br /> Project Managers. The Project Managers may also identify additional secon- <br /> dary documents. <br /> 12.5 Meetings of the Project Managers on Development of Documents: The <br /> Project Managers shall meet approximately every sixty (60) days, except as <br /> otherwise agreed by the Parties, to review and discuss the progress of work <br /> being performed at the Site on the primary and secondary documents. Prior <br /> to preparing any draft document specified in Subsections 12.3 and 12.4, the <br /> Project Managers shall meet to discuss the document results in an effort to <br /> -20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.