My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> within twenty-one (21) days. Upon request, and prior to risnlvinq the <br /> dispute, the Administrator shall meet and confer with the Army Secretariat <br /> Representative, the Executive Officer of the RWQCB, and DOHS's Deputy <br /> Director of the Toxic Substances Control Division to discuss the issue(s) <br /> under dispute. Upon resolution, the Administrator shall provide the other <br /> Parties with a written final decision setting forth resolution of the <br /> dispute. The duties of the Administrator set forth in this Section shall <br /> not be delegated. <br /> 13.8 Wherever in this Section unanimity of decision among the Parties is <br /> required for resolving disputes, OOHS and RWQCB, as agencies of the State of <br /> California, shall have one vote between them regardless of the fact that <br /> they may have more than one representative representing them at the par- <br /> ticular stage of dispute resolution. It shall be their responsibility to <br /> determine who shall cast their vote on their behalf. <br /> 13.9 The pendency of any dispute under this Section shall not affect SHAD'S <br /> responsibility for timely performance of the work required by this <br /> Agreement, except that the time period for completion of work affected by <br /> such dispute shall be extended for a period of time usually not to exceed <br /> the actual time taken to resolve any good faith dispute in accordance with <br /> the procedures specified herein. All elements of the work required by this <br /> Agreement which are not affected by the dispute shall continue and be com- <br /> pleted in accordance with the applicable schedule. <br /> 13.10 When dispute resolution is in progress, work affected by the dispute <br /> will immediately be discontinued if a DRC member requests, in writing, that <br /> work related to the dispute be stopped because, in his or her opinion, such <br /> -28- <br />
The URL can be used to link to this page
Your browser does not support the video tag.