Laserfiche WebLink
B. Other QA activities May Also Initiate <br /> Corrective Action: <br /> 2.6.1.15.4 Performance Audits <br /> 2.6.1.15.5 System Audits <br /> 2.6.1.15.6 Lab/Interfield Comparison Studie <br /> 2.6.1.15.7 QA Program Conducted by Qualit <br /> Management Staff (QAMS) <br /> 2.6.1.16 Quality Assurance Report and Managemen <br /> 2.6.1.16.1 Periodic Assessment of Data Quality, <br /> Precision & Completeness <br /> 2.6.1.16.2 Results for Performance Audits <br /> 2.6.1.16.3 Results for System Audits <br /> 2.6.1.16.4 QA problems & Solutions <br /> 2.6.1.16.5 Frequency of Report <br /> 2.6.2 Sampling Plans <br /> 2.6.2.1 Objectives of the Sampling Effort I <br /> 2.6.2.2 Maps of All Pertinent Locations & Samplin <br /> Points <br /> 2.6.2.3 Rationale for Sampling Location and Numbers <br /> of Samples <br /> 2.6.2.4 Request for Analyses <br /> 2.6.2.4.1 Narrative Request for Analyses <br /> 2.6.2.4.2 Tabular Request for Analyses <br /> 2.6.2.5 Field Methods & Procedures <br /> 2.6.2.5.1 Sample Collection <br /> 2.6.2.5.2 Disposal of Contaminated Matcrialsl <br /> 2.6.2.5.3 Equipment Decontamination <br /> 2.6.2.5.4 Sample Containers <br /> 2.6.2.5.5 Sample Preservation <br /> 2.6.2.5.6 Sample Shipment <br /> 2.6.2.5.7 Sample Documentation <br /> 2.6.2.5.8 Quality Assurance <br /> 2.6.2.5.8.1 Replicates <br /> 2.6.2.5.8.2 Blanks <br /> 2.6.2.6 Site Safety Plan <br /> 2.6.3 Data Management Plan <br /> Field sampling and analytical procedures <br /> for the acquisition & compilation of field <br /> and lab data & demonstrated activities are <br /> subject to data management procedures <br /> 2.6.3.1 Document and track data, informatioin, <br /> and results (all analytical data <br /> collected by USATHAMA and SHAD <br /> shall be reported separately using <br /> the same format and in the same report <br /> for easy reference) <br /> 2.6.3.1 Field activities <br /> 2.6.3.2 Sample management and tracki g <br /> 2.6.3.3 Document control & inventory <br /> 2.6.3.2 Identify lab documentation procedure <br /> 2.6.3.3 Project file requirements <br /> 2.6.3.4 Project related progress <br /> YC -A3-5- <br />