Laserfiche WebLink
It. Development of Proposed Plan for Remedial Action <br /> The Proposed Plan shall be consistent with CERCLA, the NCP, and other applicable EPA <br /> guidances. <br /> Itl. Public Review Comment <br /> SHAD shall provide the public the opportunities of review and comment on the RI and FS <br /> reports and the Remedial Action Proposed Plan(s) in a manner consistent with Section 30 (Public <br /> Participation) of this Agreement. <br /> IV. Responsiveness Summary <br /> SHAD shall prepare a Responsiveness Summary (part of the Record of Decision as specified in <br /> Attachment 2 of this Agreement) after the public comment period in a manner consistent with <br /> CERCLA, Section 30 (Public Participation) of this Agreement,,he EPA Community Relations in <br /> Superfund Guidance, Draft, March 1988, any revisions thereof , the NCP, and other applicable <br /> EPA guidances. <br /> V. Incorporate Appropriate Public Comments <br /> SHAD shall incorporate the appropriate public comment(s) in its Remedial Action Proposed <br /> Plan(s). <br /> V1. Prepare Record of Decision <br /> SHAD shall prepare a Record of Decision as specified in Attachment 2 of this Agreement in a <br /> manner consistent with CERCLA, the NCP, Guidance on Preparing Superfund Decision <br /> Documents: The Proposed Plan and Record of Decision, EPA, Draft, March 1988, any subsequent <br /> revisions thereof@°, other EPA applicable guidances. SHAD shall document the final remedy(ics) <br /> selected for the site. The ROD shall be based on the material contained within the <br /> Administrative Record. The ROD shall include a Responsiveness Summary which addresses <br /> major comments, concerns, criticisms, or new data raised during the Public Comment Period on <br /> the Remedial Action Proposed Plan(s), including those that may led to significant changes from <br /> the proposal(s) contained in the Proposed Remedial Action Plan. The ROD should also include <br /> schedules for remedial design, construction, remedial operations plan, and commencement of <br /> remedial action(s) as specified in Attachment 2. <br /> VII. Remedial Design <br /> SHAD shall prepare a Remedial Design Report which provides detailed engineering design and <br /> specifications which will allow other Parties to review and to ensure the selected remedy(ics) <br /> is(are) fully considered by SHAD in the Design. <br /> VIII. Remedial Action Onerations Plan <br /> SHAD shall document in the Remedial Action Operations Plan all the standard operation <br /> procedures for conducting remedial action operation. <br /> Such revisions will be provided to SHAD prior to submittal of the subject deliverable <br /> Fc -A3-12- <br />