My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• NOTE: The Fire Department and spill team have the protective clothing, <br /> materials, and equipment required to handle chemical spills and leaks. <br /> E. Non-DA Response <br /> The identified equipment and personnel listed under the IRT section will <br /> be made available, as deemed necessary by the Depot Commander, to the <br /> Regional National Response Team as requested to assist in the containment <br /> and/or clean-up of a non-DA caused spill . This will be done in accordance <br /> with the provisions of AR 500-60, Chapter 5, Paragraph 5-IF, the National Oil <br /> and Hazardous Substance Pollution Contingency Plan, August 1973. <br /> F. SHAD Facility Evacuation Plan <br /> The SHAD Facility Evacuation Plan is included in Annex E of this plan. <br /> G. Plan Updating <br /> The ISCP must be reviewed and evaluated every three years. In addition, <br /> the Plan should be amended, if need be, as new materials are used or stored <br /> at the SHAD facility. Furthermore, the Plan should be reviewed after each <br /> spill to ensure the Plan' s effectiveness. <br /> • <br /> II-10 <br /> (10/30/89) <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.