My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 2 91 16 : 49 FRENVIRONMENTAL Si- I ENG PPGE . OL17 <br /> C-S HAD RI FS91.2/VES WP.7 <br /> DCS/18/91 <br /> above the sand pack to a thickness of 5 ft. Concrete will then be <br /> poured from the top of the bentonite to the surface. The vapor well <br /> will be fitted with a slip cap, and the entire well assembly will be <br /> enclosed at the surface by a cast iron traffic rated vaultbox cemented <br /> in place. <br /> 7. The wells will be installed under the supervision of qualified ESE <br /> personnel, who may elect to change the screened intervals based on <br /> the results of the soil borings taken from the first VEW installati9n. <br /> The purpose of alternating the screened intervals is to monitor the <br /> effects of vapor extraction at different depths and through different soil <br /> types. <br /> South Balloon Area (Soil Area 8) <br /> 1. The three VF,Ws in Soil Area 8 will be installed at intervals of 301t <br /> along a horizontal line. The first VEW will be installed approximately <br /> 70 ft southeast of monitor well 425 (see Fig. 2-5). <br /> ' 2. The two VMWs will also be installed at intervals of 30 ft on a <br /> 90-degree radial from the VEWs (see Fig. 2-5). <br /> 3. The three VEWs will be labeled VEW 1-8, VEW 2-8, and VEW 3-8. _ <br /> The two VMWs will be labeled VMW 1 and VMW 2 (see Fig. 2-5). <br /> ' 4. Soil samples will be collected every 2.5 ft in the first boring to verify <br /> the subsurface stratigraphy encountered in the pilot test area. <br /> S. Based on expected subsurface stratigraphy developed during the <br /> remedial investigation, the VEWs and VMWs will be installed as <br /> outlined in Table 2-1 and Figs. 2-6 and 2-7. <br /> 6. All lengths of pipe, both slotted and blank, will be connected by <br /> threaded joints. No glues or adhesives will be used. <br /> 2-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.