JUL 2 91 16 : 49 FRENVIRONMENTAL Si- I ENG PPGE . OL17 <br /> C-S HAD RI FS91.2/VES WP.7 <br /> DCS/18/91 <br /> above the sand pack to a thickness of 5 ft. Concrete will then be <br /> poured from the top of the bentonite to the surface. The vapor well <br /> will be fitted with a slip cap, and the entire well assembly will be <br /> enclosed at the surface by a cast iron traffic rated vaultbox cemented <br /> in place. <br /> 7. The wells will be installed under the supervision of qualified ESE <br /> personnel, who may elect to change the screened intervals based on <br /> the results of the soil borings taken from the first VEW installati9n. <br /> The purpose of alternating the screened intervals is to monitor the <br /> effects of vapor extraction at different depths and through different soil <br /> types. <br /> South Balloon Area (Soil Area 8) <br /> 1. The three VF,Ws in Soil Area 8 will be installed at intervals of 301t <br /> along a horizontal line. The first VEW will be installed approximately <br /> 70 ft southeast of monitor well 425 (see Fig. 2-5). <br /> ' 2. The two VMWs will also be installed at intervals of 30 ft on a <br /> 90-degree radial from the VEWs (see Fig. 2-5). <br /> 3. The three VEWs will be labeled VEW 1-8, VEW 2-8, and VEW 3-8. _ <br /> The two VMWs will be labeled VMW 1 and VMW 2 (see Fig. 2-5). <br /> ' 4. Soil samples will be collected every 2.5 ft in the first boring to verify <br /> the subsurface stratigraphy encountered in the pilot test area. <br /> S. Based on expected subsurface stratigraphy developed during the <br /> remedial investigation, the VEWs and VMWs will be installed as <br /> outlined in Table 2-1 and Figs. 2-6 and 2-7. <br /> 6. All lengths of pipe, both slotted and blank, will be connected by <br /> threaded joints. No glues or adhesives will be used. <br /> 2-10 <br />