Laserfiche WebLink
FINAL • DDRW�arpe Well Installation Work Plan <br /> LIST OF FIGURES <br /> Pape <br /> 2-1 Well Locations QDRW-Sharpe.............................................................................................. ........2 <br /> 4-1 Wellhead Construction Detail-Monitoring Wells and Piezometers..................................... ........7 <br /> 9-1 Location of Injection Wells- Central Area Groundwater Treatment Plant............................ ......12 <br /> 9-2 Procedures for Evaluating the Central Area Injection Wells and Making Recommendation ......14 <br /> LIST OF TABLES <br /> Pape <br /> 2-la Phase 1 On-Installation Construction Specifications for Proposed Monitoring Wells......... .........3 <br /> 2-1b Phase 2 Off-Installation Construction Specifications for Proposed Monitoring Wells......... .........4 <br /> 7-la Phase 1 On-Installation Wells Recommended for Abandonment at DDRW-Sharpe............ .......10 <br /> 7-lb Phase 2 Off-Installation Wells Recommended for Abandonment at DDRW-Sharpe........... .......11 <br /> ATTACHMENTS <br /> Attachment 1 DDRW-Sharpe Missing Well Survey Information(Land Survey) <br /> Attachment 2 DDRW-Sharpe Missing Well Survey Information(GPS) <br /> Attachment 3a Phase 1 On-Installation Sharpe Wells Recommended for Maintenance <br /> Attachment 3b Phase 2 Off-Installation Sharpe Wells Recommended for Maintenance <br /> S-SSWP.DOC ii Sept tuber 1996 <br />