My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL • DDRN*arpe Well Installation W rk Plan <br /> • Reference elevation for all depth support the filter pack and in-situ soils <br /> measurements; surrounding the screen. The well screen rface <br /> will be free of solvents, oils, grease, pain , and <br /> • Boring abandonment procedures (if dirt and will be certified clean from the f Lctory <br /> applicable); or steam-cleaned on site prior to installa on. <br /> • Name of driller; and The well screen will have smooth, sharp- dged <br /> openings free of burrs, chipped edges, or broken <br /> • Name and signature of the field geologist pieces on the interior and exterior surfaces of <br /> preparing the log. the pipe. Sections of the screen will arriv <br /> certified as clean by the supplier, and wrapped <br /> 4.0 MONITORING WELIJ in polyethylene protective wrappers with sealed <br /> PIEZOMETER CONSTRUCTION ends in order to limit exposure to potenti <br /> contaminants.Wrapping will not be removed <br /> Installation of five groundwater monitoring well until screen is to be used. <br /> clusters and one piezometer cluster are <br /> recommended for this field effort. Proposed 4.3 Filter Pack <br /> monitoring well and piezometer locations are <br /> shown in Figure 2-1.Figure 4-1 shows The filter pack material will be composei I of <br /> generalized specifications for piezometer and round,hard, waterworn siliceous sand, fr 5e of <br /> monitoring well wellhead completion. flat or elongated pieces,organic matter,or other <br /> foreign matter. All filter pack material w 11 be <br /> 4.1 Well Casing protected from contamination prior to pl cement <br /> by either storing it in plastic-lined paper ags or <br /> Well casing will be 2-inch and 4-inch nominal in a location protected from the weather ind <br /> diameter Schedule 40 PVC pipe with flush contamination on plastic sheeting. <br /> threads for the piezometers and monitoring <br /> wells, respectively.The casing surface will be 4.4 Bentonite Seal <br /> free of solvents, oils,grease,paint, and dirt and <br /> will be certified clean from the factory. In A bentonite seal will be placed above the filter <br /> addition, the casing will be steam-cleaned on pack to protect the filter pack during gro ting. <br /> site prior to installation. Sections of casing will The bentonite seal will be made from bentonite <br /> arrive certified as clean by the supplier, and pellets or chips. <br /> wrapped in polyethylene protective wrappers <br /> with sealed ends in order to limit exposure to 4.5 Cement Grout <br /> potential contaminants.Casing will not be <br /> removed from the wrapping until immediately A cement grout will be used to fill the annular <br /> before it is to be placed in the boring. space above the filter pack. Cement groi t will <br /> consist of Type II Portland cement with <br /> 4.2 Well Screen pounds of powdered nonbeneficiated be itonite <br /> and 7 gallons of water per 94-pound sac of <br /> The well screen will be 2-inch and 4-inch cement.The cement grout will be mech nically <br /> nominal diameter,Schedule 40 PVC slot screen mixed with a paddle type mixer.No acc Aerator <br /> with flush threads for the piezometers and will be added to the grout. <br /> monitoring wells, respectively.All screen <br /> openings will widen inward so as to be non- 4.6 Wellheads <br /> clogging.The slot size will be compatible with <br /> the filter pack that will surround the screen;slot Wellheads will be constructed as shown and <br /> size and filter pack will be determined based on with those materials indicated in the wellhead <br /> pilot boring lithologies. The well screen will be construction details on Figure 4-1. The <br /> of sufficient size and design to hold back and ` <br /> S-SSWP.DOC 6 Sep tuber 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.