My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL • DDRWharpe Well Installation Work Plan <br /> observation piezometers and monitoring wells • Depth interval of filter pack; <br /> will be protected at the surface by a 10-inch <br /> diameter steel pipe with locking cover. The • Filter pack description; <br /> protective steel pipe will extend to a height of . Depth interval of well screen; <br /> 36 inches above the ground surface and will be <br /> set in a 4-foot square, 4-inch thick concrete pad • Well screen description (including material, <br /> that slopes away from the steel pipe.A bronze slot type, and slot size); <br /> survey marker with a 2-inch diameter domed <br /> cap will be set in the concrete pad.The wellhead • Location of centralizers; <br /> will be protected by four steel posts,7 feet long <br /> and 4 inches in diameter,that extend 4 feet • Location and description of drawdoA n tube; <br /> above the ground surface.The posts will be <br /> placed around the wellhead and embedded in Well development method; <br /> concrete-filled postholes.The protective casings . Well development data; <br /> and posts will be painted with bright yellow <br /> permanent paint. • Generalized surface completion; <br /> 4.7 Well Construction Diagrams • Reference elevation for all depth <br /> measurements; <br /> During the construction of each monitoring well <br /> and piezometer, an as-built diagram of the well • Name of driller; and <br /> will be recorded by the field geologist. . Name and signature of the field geolc gist <br /> Information provided in the as-built well preparing the well construction diag <br /> diagrams will include the following: <br /> • Project and site names; 5.0 POST MONITORING WELL <br /> INSTALLATION ACTIVITIES <br /> • Well number and dates constructed; <br /> 5.1 Monitoring Well Develo ent <br /> • Location of the monitoring well; <br /> Each well will be developed after well ca ing <br /> • Type of drill rig; installation.Well development procedurewill <br /> • Size and type of drilling method; follow those outlined in the Comprehenst le <br /> Field Work Plan. Wells will be bailed wii h a <br /> • Nominal boring diameter; sand-pump bailer(bailer containing a phr iger <br /> device that draws sediment into the bailei and a <br /> • Location and thickness of each stratum and flap that traps the material as the bailer is <br /> a brief description of each stratum; withdrawn)to remove fine sand inside the well <br /> casing; bailing will continue until fine gr ' ed <br /> • Depth of the static water level during sediment removed from the well decreases to <br /> drilling—upon completion of well less than an estimated one teaspoon of sediment <br /> construction, and before and after well in one bailer load.The well will then be s irged <br /> development(including the date and time of for at least 30 minutes or until the amouni of <br /> the water level measurements); sediment entering the well decreases to a evel <br /> • Total depth of completed well; deemed acceptable to the field geologist. hrell <br /> development data recorded will include Id <br /> • Depth intervals of well seals and grouts; determinations of pH, temperature, specific <br /> conductivity, turbidity data, the total num Der of <br /> • Seal and grout descriptions; well volumes purged from the well durin <br /> S-SSWP.DOC 8 Septe bei 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.