Laserfiche WebLink
FINAL • DDRW-S•Well Installation Wor c Plan <br /> area located at the southeast corner of the 11.0 REFERENCES <br /> installation. <br /> Radian Corporation, 1996a. FFA Annual <br /> 10.6 Sampling and Characterization. Progress Report: January 1995 Through <br /> Sampling of soil cuttings will be performed in December 1995. Draft. May. <br /> order to characterize the waste and determine <br /> the proper means of disposal. When required, Radian Corporation, 1996b. Defense <br /> sampling frequency will consist of a minimum Distribution Region West-Sharpe and Defesse <br /> of two soil samples for every 10 cubic yards of Distribution Region West-Tracy, Californi r. <br /> storage container. Sampling procedures will Comprehensive Field Work Plan. Final <br /> follow the steps outlined in the Comprehensive (Version 1.0). June. <br /> Field Work Plan. Specific waste profiling <br /> requirements are described in the DDRW- Radian Corporation, 1996c. Waste <br /> Sharpe/Tracy Waste Management Plan (Radian Management Plan,DDRW-Shalpe/Tracy.Final. <br /> Corporation, 1996c). Soil samples may be August. <br /> analyzed for the following: <br /> • pH; <br /> • Halogenated organics using EPA Method <br /> 8010; <br /> • Semivolatile organic compounds (SVOCs); <br /> • Organochlorine pesticides; <br /> • Chlorinated herbicides; <br /> • Total threshold limit metals using EPA <br /> Methods 6010 and the 7000 series; <br /> • Toxicity Characteristic Leaching Potential <br /> (TCLP) (for metals, pesticides,herbicides, <br /> VOCs, and SVOCs); and <br /> • Total petroleum hydrocarbons (T?H), <br /> quantified as gas or diesel using Method <br /> 8015 (only for fuel-related cuttings). <br /> 10.7 Wastewater sampling and analysis will <br /> not be required;wastewater will be discharged <br /> to the on-installation groundwater treatment <br /> facility (South Balloon Treatment Plant). <br /> 10.8 Disposal. Proper disposal of the solid <br /> IDW will be determined based upon analytical <br /> results. All solid IDW will be disposed in <br /> accordance with federal and state regulations as <br /> outlined in the Comprehensive Field Work Plan. <br /> Specific disposal facilities and waste profiling <br /> requirements are described in the DDRW- <br /> Sharpefrracy Waste Management Plan. <br /> S-SSWP.DOC 15 Septe be 1996 <br />