Laserfiche WebLink
DDJC-Sharpe Groundwater Mon&g Well Installation Wc rk Plan <br /> 1.0 INTRODUCTION (TCE)plume and provide water level data to <br /> better define the North Balloon capture zc.1es <br /> 1.1 The purpose of this work plan is to describe (URS,2003b).The four-well cluster will i erify <br /> a groundwater monitoring well installation the western extent of the volatile organic(om- <br /> effort to be conducted west of the Defense pound(VOC)plumes in four depth interys; <br /> Distribution Depot San Joaquin California— provide guard wells between extraction wells <br /> Sharpe Site(DDJC-Sharpe).A cluster of four and PWO44 and PWO47 privately owned I otable <br /> monitoring wells,MW526A,MW526B, water wells;and provide additional water evels <br /> MW526C,and MW526D,will be installed as to define flow directions and capture zone <br /> part of DDJC's ongoing groundwater remedia- where a data gap now exists (URS,2001). <br /> tion efforts to provide effective monitoring of <br /> the groundwater plumes.Figure 1-1 shows the 1.4 The location of the MW526 cluster i <br /> location of the MW526 cluster. The wells will shown on Figure 1-1.The well design spe ifica- <br /> be located on private property east of Harlan tions for the proposed MW526 well cluster are <br /> Road,which requires a property easement. provided in Table 1-1 and are based on th <br /> specifications presented in the DDRW-Sh upe <br /> 1.2 The proposed MW526 well cluster was Well Installation Work Plan (Radian Co ra- <br /> originally recommended for installation on the tion, 1996b).A diagram of a typical grou - <br /> San Lorenzo Lumber property in the 1995 water well multiple completion design is s lown <br /> DDRW-Sharpe Federal Facilities Agreement on Figure 1-2.Planned well installation <br /> Annual Progress Report(Radian Corporation, activities are discussed in Sections 2.0,3.(,4.0, <br /> 1996a),but after repeated attempts,a lease and 5.0. A more complete discussion of well <br /> agreement could not be obtained with the construction procedures is presented in th <br /> property owner. In 2002, an alternate location DDJC-Sharpe/Tracy Comprehensive Fiel <br /> was selected approximately 600 feet northwest Work Plan Field Procedures(URS, 2004a).The <br /> of the original location on the Lathrop Sands well installation is tentatively scheduled f r July <br /> Mobile Home Park property. However, an 2004 depending on the acquisition of the r ght- <br /> easement agreement could not be obtained on of-entry agreement and a county well <br /> this property.In 2003,a third proposed location, installation permit. Costs associated with his <br /> approximately 100 feet to the south of the field effort are consistent with those prese ited <br /> location on Lathrop Sands property,was chosen in the Task Order 07 budget estimates. <br /> (Figure 1-1)(URS,2003a);however,an ease- <br /> ment on this property was found to be impracti- 2.0 WELL INSTALLATION <br /> cal because the property will be undergoing ACTIVITIES <br /> construction of a commercial business. <br /> Recently,it was discovered that the San 2.1 Pre-Well Installation Activi ies <br /> Lorenzo Lumber property(original proposed <br /> location)has undergone a property ownership Before any drilling is initiated,a well inst Ila- <br /> change.The new property owners were con- tion permit will be obtained from San Joa uin <br /> tacted,and have agreed to allow the government County Environmental Health Departmen , as <br /> to install the wells on their property.A right-of- well as clearance of aboveground and <br /> entry agreement is currently being executed by belowground utility hazards at all of the <br /> the United States Army Corps of Engineers, locations. <br /> Sacramento District—Real Estate(CESPK-RE) <br /> to allow the wells to be installed prior to the 2.2 Field Documentation <br /> permanent easement acquisition. <br /> 2.2.1 The URS field geologist will maintain an <br /> 1.3 MW526A,MW526B,MW526C,and accurate log for all the borings.At a minimum, <br /> MW526D will be installed to monitor potential the log shall include: <br /> off-installation migration of the trichloroethene <br /> KAWpro m\00363\sharpe\MW 1nsta11atirmrF1NALN4W526.dne 1 J ne 2004 <br />