My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DDJC-Sharpe Groundwater Mo*g Well Installation Wc rk Plan <br /> depths exceeding 100 feet below ground surface 4.0 WELL MATERIALS <br /> (bgs)due to the potential for heaving sands and <br /> the difficulty in controlling these sands using 4.1 Well Casing <br /> augers.The mud rotary borehole will also <br /> contain a multiple completion well,with the C The well casing will be 2-or 4-inch nomil lal <br /> and D Zone wells constructed using 4-inch- diameter Schedule 40/80 PVC pipe with f ush <br /> diameter PVC casing(see Section 5.2 of the threads for the monitoring wells.The casi ig <br /> DDJC-Sharpe/Tracy Comprehensive Field surface will be free of solvents,oils,grea e, <br /> Work Plan Field Procedures [URS,2004a] for paint, and dirt and will be certified clean I torn <br /> details regarding construction of multiple the factory or steam-cleaned on site prior o <br /> completion wells).Upon completion of drilling installation. Sections of casing will be rec ived <br /> and logging,the two borings will be reamed from the supplier wrapped in polyethylen <br /> using their respective drilling method to at least protective wrappers with sealed ends in oi der to <br /> 10 inches for the installation of the 2-and 4- limit exposure to potential contaminants. Casing <br /> inch-diameter monitoring wells in sandy zones will not be removed from the wrapping in til <br /> in the A,B,C, and D aquifer zone intervals. immediately before it is to be placed in th <br /> Additional detail regarding the hollow-stem boring. <br /> auger method of drilling and mud rotary method <br /> of drilling is included in the DDJC-Sharpe/ 4.2 Well Screen <br /> Tracy Comprehensive Field Work Plan Field <br /> Procedures(URS,2004a). The well screen will be 2-or 4-inch no al <br /> diameter,Schedule 40/80 PVC with flush <br /> 3.0 WELL SPECIFICATIONS threads for all the monitoring wells(shallow <br /> wells will have 2-inch-diameter casing). l <br /> The monitoring wells will be installed using screen openings will widen inward so as to be <br /> guidelines set forth in the DDJC-Sharpe/Tracy nonclogging. The slot size will be compatible <br /> Comprehensive Field Work Plan Field with the filter pack that will surround the <br /> Procedures(URS,2004a).The well design screen; slot size and filter pack will be de -r- <br /> specifications of the proposed monitoring wells mined based on pilot boring lithologies.The <br /> are provided in Table 1-1. The total depths and well screen will be of sufficient size and <br /> screen lengths for MW526A,MW526B, designed to hold back and support the felt r pack <br /> MW526C,and MW526D are estimated based and in situ soils surrounding the screen. T ie <br /> on the total depths and screen lengths of nearby well screen surface will be free of solvent;,oils, <br /> monitoring wells in the A,B,C,and D Zones, grease,paint,and dirt and will be certifte clean <br /> respectively (Radian Corporation, 1996b). from the factory or steam-cleaned on site nor <br /> Attachment A contains boring logs for nearby to installation.The well screen will have <br /> monitoring wells MW522A,MW522B, smooth, sharp-edged openings free of bur.7s, <br /> MW522C,and MW527D. A diagram of a chipped edges,or broken pieces on the ini erior <br /> typical groundwater monitoring well multiple and exterior surfaces of the pipe. Section of the <br /> completion design is shown on Figure 1-2 screen will be received from the supplier <br /> (Figure 1-2 is taken from the DDJC-Sharpe/ wrapped in polyethylene protective wrapj ers <br /> Tracy Comprehensive Field Work Plan Field with sealed ends in order to limit exposum to <br /> Procedures [URS, 2004a];specifications shown potential contaminants.Wrapping will no be <br /> are not necessarily indicative of those described removed until screen is to be used. <br /> in this work plan,e.g.,number of wells,casing <br /> diameters,and surface completion design). 4.3 Filter Peck <br /> The filter pack material will be composed of <br /> round,hard, water-worn siliceous sand,fiee of <br /> flat or elongated pieces,organic matter,or other <br /> K\WprmmsU10363\sharpe\MW Insta11at1on\F1NAL\MW526.dw 5 June 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.