My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2900 - Site Mitigation Program
>
PR0506824
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 3:00:21 PM
Creation date
4/7/2020 2:49:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506824
PE
2960
FACILITY_ID
FA0007648
FACILITY_NAME
DDRW - SHARPES
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
01
SITE_LOCATION
850 E ROTH RD BLDG S-108
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DDJC-Sharpe Groundwater Mo ng Well Installation W rk Plan <br /> closest 1.0-foot and referenced to the State URS,2001.Recommendation for Monitoj ing <br /> Plane Coordinate System,Zone 3,North Well Cluster and Piezometers on <br /> American Datum of 1983. Ground and top of Private Properties West of DDJ - <br /> casing elevations to the closest 0.1-foot and Sharpe Memorandum.December <br /> 0.01-foot,respectively,will be obtained at each <br /> well.These elevations will be referenced to the URS,2003a.DDJC-Sharpe Proposed <br /> National Geodetic Vertical Datum of 1988. Monitoring and Extraction Well <br /> Locations Memorandum.Revisio a 1. <br /> 5.3 Groundwater Sample July. <br /> Collection <br /> URS,2003b. DDJC-Sharpe FFA Annual <br /> Following well development, water samples will Progress Report. October 2001 tj trough <br /> be collected from the four new monitoring wells September 2002.Final. June. <br /> quarterly for at least one year,as part of the <br /> annual monitoring program Sample collection URS, 2004a.DDJC-Sharpe/Tracy Comp hen- <br /> will be performed in accordance with proce- sive Field Work Plan Field Proce dures. <br /> dures outlined in the DDJC-Sharpe/Tracy Version 4.0.Final.May. <br /> Comprehensive Field Work Plan Field <br /> Procedures(URS,2004a). Samples will be URS,2004b. DDJC-Sharpe/Tracy Waste <br /> analyzed for volatile organic compounds Management Plan.Final.April. <br /> (United States Environmental Protection <br /> Agency [U.S.EPA] Method SW8021B). <br /> 5.4 Data Management <br /> 5.4.1 All data collected from location survey- <br /> ing, lithologic logging, well construction,and <br /> groundwater sample analyses under this task <br /> order will be incorporated into the DDJC- <br /> Sharpe/Tracy Environmental Data Management <br /> System(EDMS)database. Data receipt,data <br /> loading,and data quality control will be <br /> performed under a separate task order. <br /> 5.4.2 Electronic versions of all documents(i.e., <br /> CD-ROMs)will be prepared and submitted <br /> according to the procedures described in the <br /> Electronic Document Submittals(#RD-ST-002) <br /> for the DDJC-Sharpe/Tracy program. <br /> 6.0 REFERENCES <br /> Radian Corporation, 1996a.DDRW-Sharpe FFA <br /> Annual Progress Report:January 1995 <br /> through December 1995.Final. <br /> October. <br /> Radian Corporation, 1996b.DDRW-Sharpe Well <br /> Installation Work Plan.Final. <br /> September. <br /> KAWpro m\00363\sharpe\MW 1nsta11atim\F1JAL\MW526.dm 7 ]ine 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.