Laserfiche WebLink
' TABLE OF CONTENTS <br /> Sectton Page <br /> ' 10 INTRODUCTION 1 <br /> 1 1 PURPOSE 1 <br /> ' 1 2 FIELD WORK PLAN ORGANIZATION 1 <br /> 20 BACKGROUND AND PHYSICAL SETTING 2 <br /> ' 21 LOCATION 2 <br /> 2 2 SITE HYDROGEOLOGY 4 <br /> 2 3 SITE BACKGROUND 4 <br /> 30 SAMPLING AND ANALYSIS PLAN 9 <br /> 31 SAMPLING STRATEGY AND RATIONALE 9 <br /> 3 1 1 Field Analytical Screening and Sampling Rationale 10 <br /> ' 3 1 2 Soil Sampling Rationale 10 <br /> 3 1 3 Ground-Water Sampling Rationale 11 <br /> 3 2 ANALYTICAL METHODS 11 <br /> i <br /> 3 3 FIELD METHODS AND PROCEDURES 11 <br /> ' 3 3 1 Soil Gas and Ground-Water Sampling 14 <br /> 3 3 2 Soil Boring and Sampling 14 <br /> 3 3 3 Ground-Water Monitoring Well Construction 16 <br /> 33 4 Ground-Water Monitoring Well Development 17 <br /> 3 3 5 Surveying of Well Locations 17 <br /> ' 3 3 6 Ground-Water Sampling 18 <br /> 3 3 7 Decontamination Procedures 21 <br /> 3 3 8 Sample Handling 23 <br /> 3 3 9 Quality Assurance/Quality Control Field Samples 24 <br /> ' REFERENCES 26 <br /> 1 <br /> t <br />