Laserfiche WebLink
STI SP001 Portable Container Monthly Inspection Checklist <br /> General Inspection Information: <br /> Inspection Date: Prior Inspection Date: Retain until date: <br /> Inspector Name(print): Title: <br /> Inspector's Signature(): <br /> Container(s)inspected ID <br /> Regulatory facility name and ID number(if applicable) <br /> Inspection Guidance: <br /> ➢ This checklist is intended as a model. Locally developed checklists are acceptable as long as they are substantially equivalent(as applicable). <br /> ➢ This periodic Inspection is intended for monitoring the external condition and its containment structure. This visual inspection does not require a <br /> Certified Inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. Note <br /> the non-conformance and corresponding corrective action in the comment section. <br /> ➢ Retain the completed checklists for at least 36 months. <br /> Item IArea: Area: Area: Area: <br /> Portable Container Con tainment/Storage Area <br /> 1 Are all portable container(s)within designated DYes DNo DYes []No ❑Yes []No DYes DNo <br /> storage area? <br /> 2 Is the containment and storage area free of excess <br /> liquid, debris,cracks orfire hazards? DYes DNo DYes DNo DYes []No ❑Yes DNo <br /> 3 Are drain valves closed and in good working DYes D No oN/A DYes D No DN/A DYes D No DN/A DYes D No DN/A <br /> condition? <br /> 4 Are containment egress pathways clear and any DYes D No DN/A DYes D No El NIA DYes D No 11 N/A ❑Yes D No DN/A <br /> ates/doors operable? <br /> Container <br /> 5 Is the container free of leaks? <br /> Note:If"No", identify container and describe ❑Yes DNo ❑Yes DNo DYes DNo DYes []No <br /> leak. <br /> 6 Is the container free of distortions, buckling, denting DYes DNo DYes []No DYes DNo DYes DNo <br /> or bulging? <br /> Portable Container Checklist Page 1 of 2 <br />