Laserfiche WebLink
VICINITY MAP/EMERGENCY ROUTE:See Attached <br /> SITE SKETCH: Refer to attached figure <br /> UNDERGROUND UTILITY CLEARANCE: To be completed by both underground ervice alert and a private locate <br /> contractor, All soil borings to be cleared to 5 feet bas utilizing hand augers <br /> EXCAVATION, DRILLING, AND/OR SAMPLING METHOD(S): Soil borings by hand auger, direct-push and hollow-stem <br /> guger drilling. Soil sampling by continuous or grab sampling. <br /> COMMENTS: Exclusion zone extends 25 feet around drilling rig.. Contaminant reduction zone is the decontamination area <br /> adjacent to the ETG field vehicle The clean zone is the remainder of the site, Restrict access to the work area with <br /> caution/barrier tape traffic cones warningsigps or barricades as appropriate <br /> SAFETY EQUIPMENT AND PROCEDURES <br /> INITIAL LEVEL OF PROTECTION: ❑ C ® D <br /> REQUIRED PERSONAL PROTECTIVE EQUIPMENT: dame resistant coveralls protective footwear and high-vlsibilily <br /> orange safety vests are required on-site. A hard hat hearing protection,and safety glasses are reps fired during drilling <br /> activity and will be used during other field work when conditions warrant (See PPF ch k li t) Nitrile gloves must be <br /> used when handlingsoit or eroundwater. FargShield.or goggles must be worn when there is a potential for splash. <br /> AIR MONITORING EQUIPMENT AND PROCEDURES:Photo-ionization detector and/or direct reading tubes <br /> BREATHING ZONE ACTION LEVELS: 0 ppm - 10 ppm = Level 10 ppm but <50 ppm = Mod Level C. <br /> >50 ppm=Stop Work <br /> COMMUNICATIONS:A mobile phone will be available at the ETG field vehicle if there is not a phone already on site. <br /> DECONTAMINATION PROCEDURES: If the potential for transferring contaminants into the clean area exists.use soap, <br /> water, and a brush to scrub footwear clean before leaving the site Discard contaminated gloves in a plastic hag and <br /> dispose of in a solid Waste container. Wash hands and face prior to breaks and before leaving site Bring soap and wash <br /> water if a wash room is not available at the site <br /> Soil Boing and Well Install HASP 2012 Rev.0,05/18/12 <br />