My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SITE CHARACTERIZATION WORK PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3015
>
2900 - Site Mitigation Program
>
PR0537136
>
ARCHIVED REPORTS_SITE CHARACTERIZATION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2020 2:09:41 PM
Creation date
4/8/2020 2:02:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SITE CHARACTERIZATION WORK PLAN
RECORD_ID
PR0537136
PE
2960
FACILITY_ID
FA0021316
FACILITY_NAME
NUSTAR ENERGY, LP
STREET_NUMBER
3015
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
3015 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VICINITY MAP/EMERGENCY ROUTE:See Attached <br /> SITE SKETCH: Refer to attached figure <br /> UNDERGROUND UTILITY CLEARANCE: To be completed by both underground ervice alert and a private locate <br /> contractor, All soil borings to be cleared to 5 feet bas utilizing hand augers <br /> EXCAVATION, DRILLING, AND/OR SAMPLING METHOD(S): Soil borings by hand auger, direct-push and hollow-stem <br /> guger drilling. Soil sampling by continuous or grab sampling. <br /> COMMENTS: Exclusion zone extends 25 feet around drilling rig.. Contaminant reduction zone is the decontamination area <br /> adjacent to the ETG field vehicle The clean zone is the remainder of the site, Restrict access to the work area with <br /> caution/barrier tape traffic cones warningsigps or barricades as appropriate <br /> SAFETY EQUIPMENT AND PROCEDURES <br /> INITIAL LEVEL OF PROTECTION: ❑ C ® D <br /> REQUIRED PERSONAL PROTECTIVE EQUIPMENT: dame resistant coveralls protective footwear and high-vlsibilily <br /> orange safety vests are required on-site. A hard hat hearing protection,and safety glasses are reps fired during drilling <br /> activity and will be used during other field work when conditions warrant (See PPF ch k li t) Nitrile gloves must be <br /> used when handlingsoit or eroundwater. FargShield.or goggles must be worn when there is a potential for splash. <br /> AIR MONITORING EQUIPMENT AND PROCEDURES:Photo-ionization detector and/or direct reading tubes <br /> BREATHING ZONE ACTION LEVELS: 0 ppm - 10 ppm = Level 10 ppm but <50 ppm = Mod Level C. <br /> >50 ppm=Stop Work <br /> COMMUNICATIONS:A mobile phone will be available at the ETG field vehicle if there is not a phone already on site. <br /> DECONTAMINATION PROCEDURES: If the potential for transferring contaminants into the clean area exists.use soap, <br /> water, and a brush to scrub footwear clean before leaving the site Discard contaminated gloves in a plastic hag and <br /> dispose of in a solid Waste container. Wash hands and face prior to breaks and before leaving site Bring soap and wash <br /> water if a wash room is not available at the site <br /> Soil Boing and Well Install HASP 2012 Rev.0,05/18/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.