My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:55 PM
Creation date
4/8/2020 2:23:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- GRO-PHASE <br /> ENVIMONMENTAL <br /> GPE Project No.: 207.3 <br /> December 29, 2008 <br /> Mr. Harlin Knoll <br /> San Joaquin County EHD <br /> 600 E. Main Street <br /> Stockton, CA 95202 <br /> Re: Contaminant Mass Removal <br /> Location: Former Manna Pro Site,4004 S.El Dorado St.,Stockton <br /> Dear Mr. Knoll: <br /> This letter is in response to your request for information dated December 22, 2008 regarding the <br /> contaminant mass removed at the site. \ <br /> As you know, Geo-Phase Environmental has operated a VES/AS remedial system for several years. <br /> The remedial system is generally monitored and serviced on a twice-weekly basis. For more than a <br /> year, the remedial system has been operated on an approximately half-time basis. In general the <br /> system is on for a month and then off the following month. This "pulsed" operating schedule is <br /> believed to reduce O&M costs without significantly reducing total mass removal. In essence it <br /> increases the efficiency of the system. <br /> The following lists some important dates of the remedial process. <br /> • 4/2000 - Pilot VES Test <br /> • 7/28/00—Report of Pilot Test <br /> 2/16/01 —CAP Submitted <br /> • 6/18/02—Report of First Phase System Construction&Operation(3 Wells, 95 Days) <br /> • 8/12/02—CAP Addendum <br /> • Q2&Q3/2003 —Remedial System Construction <br /> • 9/4/03—System Startup <br /> • 9/26/03 —Report of Sys Construction& Startup <br /> The system monitoring includes measuring the PID concentration of extracted gasoline vapor and <br /> measurement of the extraction rate. Occasional lab samples are also collected for laboratory <br /> measurement of the richness of extracted vapor. Experience has shown that the richness of the <br /> extracted vapor varies widely and often times, rapidly. Because of the erratic nature of the vapor <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.