My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/8/2020 2:27:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f i , <br /> Case Closure Summary Page)00 <br /> Leaking Underground Fuel Storage Tank Program <br /> III Release and Site Characterization information (continued) <br /> Maximum Documented Contaminant Concentrations--Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Son <br /> Before After Before After (ppm) Water (ppm) <br /> Before After Before After <br /> TPH(Gas) 1240 1240 <0.050 <0.050 Xylene <0.50 <0.50 <0.00050 <0.0005 <br /> TPH(Diesel) 50200 50200 23.10 0.240 Ethylbenzene <0.50 <0.50 <0.00050 <0.0005 <br /> Benzene <0.50 <0.50 <0.00050 <0.00050 Oil&Grease NA NA NA NA <br /> Toluene <0.50 <0.50 <0.00050 <0.00050 Heavy Metals Pb<13 <13 NA NA <br /> MTBE <0.050 <0.050 <br /> Comments: <0.0050 <0.0050 <br /> The soil before and after concentrations are from a sample collected at 30 bsg in soil boring C-4/6,which was completed in <br /> the UST source area. The ground water before and after concentrations are from MW-1 located in the UST source area. <br /> Water contaminant concentrations have declined over time in all of the impacted MWs. Lead (heavy metal)concentration is <br /> from the soil sample collected at the time of UST removal. MTBE in soil and round water is from Is from soil boringB-4. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan?Yes <br /> Does corrective action protect public health for current land use?Yes <br /> Site management requirements: NA <br /> Should corrective action be reviewed if land use changes?Yes <br /> Monitoring/Vapor wells Decommissioned: No Number Decommissioned: 0 Number retained: 7 <br /> List enforcement actions taken: NOR sent to the RP <br /> List enforcement actions rescinded: NA <br /> V. Local j%ency Representative Data <br /> Name:Adrienne Ellsaesser Title:Acting Program Coordinator REHS <br /> Signature Date: <br /> VI. Central Valley Re ional Water Quality Control Board RB Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: J. Barton Response: <br /> Title: Eng. Geologist <br /> VII.Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER,Shall be retained by the lead agency as part of the official <br /> site file. <br />
The URL can be used to link to this page
Your browser does not support the video tag.