My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005445
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:34:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005445
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 AGENCY DISCUSSIONS <br /> The Lead Agency for this site remediation is the San Joaquin County Public Health <br /> Service, Environmental Health Division The current contact is Jeffrey Wong, REHS, <br /> LOP/Site Mitigation Unit IV 304 East Weber Ave , 3`d Floor, Stockton, CA 95202, (209) j <br /> ' 468-0335 <br /> The initial meeting since DK Barber's hire was held September 19, 2000 between <br /> WO&S's Jeff Hopkins, PHSIEHD's Jeff Wong and Dot Lofstrom and D K Barber P E & <br /> Associates' Dan Barber The PHS/EHD representatives said that they could not accept <br /> the contention that the "shallow water" body was isolated from the deeper groundwater <br /> table, additional definition of any groundwater contamination was necessary and that the <br /> mass of contamination if left in situ would have to be better defined to estimate any long <br /> term impact or risk <br /> 22 2000 letter to the owner, WO&S that a monitoring <br /> PHSIEHD stated in its Septemberg <br /> well with a full season of sampling is required as part of the groundwater contamination <br /> investigation, 3 additional borings utilizing direct push technology (DPT) to define the <br /> lateral extent of the groundwater contamination, the extension of one of the 3 DPT <br /> borings and collection of a grab groundwater sample, implied collection from the "shallow <br /> water body" 30 FT bsg and that the work be implemented no later than November 15, <br /> r2000 Reference Appendix F, " Correspondence between Western Oil & Environmental <br /> Health Division" <br /> l <br /> The D K Barber P E and Associates' "Work Plan for Soil and Groundwater <br /> Characterization, dated October 17, 2000", addressed several areas of concern and <br /> specifically addressed protocols and safety plan requirements for the Acampo Plant Site <br /> ' Two well drilling permits were issued one for Fisch Environmental Services and the other <br /> for Woodward Drilling Inc <br /> 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.