My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005445
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:27 PM
Creation date
4/8/2020 2:34:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005445
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 CONTROLS <br /> [ 41 Health and Safety Plan <br /> The plan presented in the October 17, 2000 work plan continues in effect but must be <br /> 1 L 1 reviewed and updated prior to resumption of exploration activity at the Acampo site <br /> L <br /> 4.2 Work Plan & Schedule <br /> Scheduling of characterization work has considered the following The source of <br /> additional contaminants has been removed Equipment and manpower resources are <br /> limited and may require upwards to 6 weeks advance notice and commitment Work will <br /> be performed by WO&S using subcontracted equipment and manpower under the <br /> direction of D K Barber P E and Associates Technical guidance and sampling will be <br /> carried out by a licensed civil engineer responsible to WO&S <br /> Following agency review, comments, and approval of additional work, the site layout, <br /> ' underground utility location, and well drilling permit application will commence <br /> immediately Borings and monitoring well construction tentative scheduling will consider a <br /> duration to be two to six weeks depending upon extent of borings, laboratory findings and <br /> weather A minimum of two weeks turnaround time for all state certified laboratory testing <br /> is anticipated unless quicker turnaround time would benefit the protect, in which case, <br /> ' turnaround time may be shortened at greater cost <br /> The earlier Interim Phase 11 report prepared by D K Barber P E & Associates reflected <br /> work and findings between November 2000 and February 28, 2002 (Reference Appendix <br /> H) The report was amended April 26, 2002 (Reference Appendix 1) with the most <br /> recently collected monitoring well data <br /> ' The target completion date of all sampling at the Acampo Plant Site is July 30, 2002 <br /> Completion date will be highly dependent upon weather delays and any further testing <br /> ' incurred with additional Phase II characterization <br /> Final report preparation will require about 60 days after the final quarterly monitoring <br /> well(s) sampling <br /> ( 4-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.