My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005474
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/8/2020 3:37:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005474
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 1.3 Proposed Excavation <br /> Proposed excavation and remediation of the Acampo site will be in keeping with <br /> the methodology outlined in Section 3 of this plan Proposed methodology is as follows <br /> o Each contaminated zone will be excavated to a depth of 10FT Lateral excavation <br /> limits will be based on olfactory and visual field analysis(i a if it can be seen or <br /> 1 smelled, and can be safely excavated, it will be) <br /> o One sidewall sample will be collected from each of the following depths 2 FT , 5 <br /> FT , and 10 FT (or bottom of excavation) The 2FT and 5FT samples will be <br /> analyzed for TPH (hydrocarbon screen) using EPA Method 8015, BTEXITPH9 using <br /> EPA Method 8020/8015 The 10 FT sample will be analyzed for TPHd(hydrocarbon <br /> screen) and BTEX One bottom sample will be collected and analyzed for TPH <br /> (hydrocarbon screen) and BTEX <br /> ' o When the boundaries of the contaminated soil are identified, the excavation will be <br /> backfilled with remediated or imported non-contaminated soil and compacted to <br /> 90% Proctor ti <br /> ® If the target concentrations are not met, soil will be excavated until analysis indicates <br /> the target concentrations are met or a depth of abot 18�feet (maximum depth of <br /> excavation equipment) is reached The excavation will then be backfilled with <br /> remediated soil <br /> ® Hydrocarbon-containing soil will be stockpiled near the excavation area for profiling <br /> and consideration of bioremediation If soil is to be bio-remediated, remediation will <br /> be conducted as described in Section 3 of this plan Remediation will be considered <br /> ' complete when soil target concentrations are reached and visual/olfactory field <br /> analysis indicates hydrocarbons are non-detectable <br /> ' 2-4 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.