Laserfiche WebLink
i <br /> Safety Practices for Excavation Operation <br /> 1 Before commencement of excavation in the vicinity of <br /> overhead electrical lines, operator shall walk around equipment and verify a <br /> minimum of 20 feet clearance be maintained Any questions regarding <br /> appropriateness of excavation location should be brought to the attention of <br /> ' the On-site Safety Coordinator <br /> 2 Safety check of equipment will be performed by the delegated <br /> ' on-site safety coordinator and the operator in conformance to Cal OSHA <br /> requirements <br /> i <br /> i <br />