My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005474
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/8/2020 3:37:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005474
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety Practices for Drill Rig Operations <br /> ' In addition, the following precautions shall be adhered to by the drill ng <br /> operator <br /> ' 1 Before raising the drill ng mast in the vicinity of <br /> electncal power lines, the operator shall walk completely around the <br /> ' drill ng to determine the distance of the rig to the nearest power line <br /> when the mast is being raised (which should be greater than 20 <br /> feet) Any questions regarding the appropriateness of a drilling <br /> ' location should be brought to the attention of the On-site Safety <br /> Coordinator <br /> 2 Before drilling begins, the location must be adequately <br /> cleaned and leveled to accommodate the dnll ng <br /> t3 Housekeeping Suitable storage for all tools, materials, <br /> and supplies shall be provided Pipe, dnll rods, casings, augers and <br /> similar drilling tools shall be stacked in an orderly manner to prevent <br /> ' rolling, spreading, or sliding <br /> 4 Work areas and drilling platforms shall be kept free of <br /> materials, obstructions, and substances that could cause a surface <br /> to become slick or otherwise hazardous <br /> ' 5 After stabilizing and leveling the dnll rig, all <br /> unnecessary personnel should be cleared from the area immediately <br /> ' to the rear and the sides of the drill mast before it is raised <br /> 6 Augers shall be used consistent with manufacturer's <br /> ' recommended methods of securing the auger to the power coupling <br /> Additionally, the operator and tool handler shall establish a safe <br /> system of responsibilities for the drilling, auger connecting and <br /> ' disconnecting, and auger fork insert/removal <br /> 7 Augers shall only be cleaned when the drill ng is in <br /> ' neutral and the auger has ceased to rotate <br /> 8 Unattended boreholes must be properly covered, or <br /> ' otherwise protected <br /> A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.