My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005474
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19256
>
2900 - Site Mitigation Program
>
PR0540323
>
ARCHIVED REPORTS_XR0005474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/8/2020 3:37:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005474
RECORD_ID
PR0540323
PE
2950
FACILITY_ID
FA0023049
FACILITY_NAME
TELFER HIGHWAY TECHNOLOGIES
STREET_NUMBER
19256
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19256 N HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> • 14 Remediation Plan Development <br /> ' The remediation plan for the WO&S Acampo site is subdivided into a soil <br /> remediation phase and a ground water phase <br /> i <br /> The objectives of this work plan are to <br /> ' (1) confirm the extent of the highly contaminated soil zone <br /> (2) complete sod remediation at the site <br /> (3) characterize shallow groundwater and threat from contamination <br /> (4) achieve closure of the sites <br /> (5) document cost and methodology for possible recovery from <br /> the State of California UST Cleanup Fund <br /> ' A draft copy of this work plan is being submitted to the San Joaquin County <br /> PHSIEHD, the CVRWQCB and adjacent land owner Mr Mike Douglas for comment prior <br /> to finalization and full implementation The available construction and soil processing <br /> window, availability of resources and no perceived threat beyond the existing WO&S plant <br /> site suggest the value of a prompt review period and conference of agency, landowner <br /> and project management <br /> ' WO&S plans to promptly schedule soil excavation of contaminated soil lying east <br /> Y g <br /> ' of the concrete containment and loading rack on APN017-090-36 and beyond the fence <br /> line on APN 017-090-02 and APN 017-090-35 Work can commence by the end of <br /> July 2004 once the draft plan is mutually acceptable <br /> IPrior to backfilling of the excavations with either remediated or imported soil, the <br /> soil will be sampled to assure that returned sod will have less than an acceptable degree <br /> of hydrocarbon contamination to be defined later in this plan Copies of all laboratory <br /> findings, volumes represented location of backfilled soil will be recorded and be included <br /> ' in subsequent report to be issued within 4 weeks following receipt of the certified <br /> 1-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.