Laserfiche WebLink
GILLIES TRUCKING • • Page 1 of 3 <br /> CSM Report - Go GEOTRACKERHOME IMANAGE PROJECTS I REPORTSISEARCH ILOGOUT <br /> GILLIES TRUCKING(T0607700234)-MAP THIS SITE OPEN-ELIGIBLE FOR CLOSURE <br /> 3931 NEWTON RDgCTIVITIES REPORT CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON ,CA 95205 SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:1703 <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CASEWORKER:ANGELICA SANDOVAL MARIN- SUPERVISOR:ADRIENNE ELLSAESSER <br /> CENTRAL VALLEY RWQCB(REGION 5S)-CASE#:390317 <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SITE CASEWORKER:JAMES BARTON- SUPERVISOR:CORI CONDON <br /> CUP Claim M.1129 CUP Priority Assigned:B CUP Amount Paid: 355 0.423 <br /> CR Site ID#:NOT SPECIFIED <br /> THIS PROJECT WAS LAST MODIFIED BY GABRIEL GONZALEZ ON 5/19/2015 2:47:05 PM-HIS RY <br /> THIS SITE HAS UNAPPROVED SUBMITTALS.CLICK HERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> CSM REPORT-VIEW PUBLIC NOTICING VERSION OF THIS REPORT <br /> UST CLEANUP FUND CLAIM INFORMATION(DATA PULLED FROM SCUFIIS) <br /> FIVE YEAR REVIEW INFORMATION <br /> AMTAGE FUND TO TO <br /> CLAIM SITE REIMB TO OF IMPACTED REVIEW REVIEWER OVERSIGHT CLAIMANT <br /> NO PRIORITY CLAIMANT ADDRESS DATE LOC WELLS 9 NUM RECOMMENDATION D� DATE <br /> 1129 B GILLIES 3931 $530,423 22 YES 5 Kirk T.Larson Case Closure d 111312015 <br /> TRUCKING, NEWTON <br /> INC. RD <br /> P O BOX STOCKTON, <br /> 8303, CA 95205 <br /> STOCKTON <br /> CA 95208 <br /> PROJECT INFORMATION(DATA PULLED FROM GEOTRACKER)-MAP THIS SITE <br /> STATUS RELEASE AGEOF CLEANUP OVERSIGHT AGENCIES <br /> SITE NAME I ADORES B STATUS DATE REPORT DATE CASE <br /> GILLIES TRUCKING Open-Eligible 4/16/2015 11/16/1988 27 SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:1703 <br /> CASEWORKER:ANGELICA SANDOVAL <br /> (Global ID:T0607700234) for Closure MARIN - SUPERVISOR.ADRIENNE ELLSAESSER <br /> 3931 NEWTON RD CENTRAL VALLEY RWQCB(REGION 6S)-CASE If.- <br /> STOCKTON, <br /> :STOCKTON,CA 95205 390317 <br /> CASEWORKER:JAMES BARTON - <br /> SUPERV/SOR:CORI CONDON <br /> STAFF NOTES(INTERNAL) <br /> As of 1 212 812 0 10 no HHRA has been conducted <br /> As of 12/28/2010 it cannot be determined that impacted GW will not migrate during periods of high GW elevation when the plume appears to <br /> intensify and expand. <br /> 8/14/2014-need assessment of potential for dissolved plume to impact nearby water supply wells. <br /> SITE HISTORY <br /> 09/16/1986:Tank No.2,a 500-gallon waste oil,removed. <br /> 11/16/1988:Unauthorized release from waste oil and diesel tanks reported;Prop 65 notice issued. <br /> 01/24/1989:Tank No.1,a 10,000-gallon diesel,and Tank No.3,a 2,000-gallon unleaded,were removed. <br /> 05/19/1989:Notice of Reimbursement issued to James Gillies. <br /> 10/06/1989:Notice of Reimbursement issued to Gillies Trucking. <br /> 07/18/1990-07/2011990:Remediation by excavation. <br /> 12/3111990:Boring TBI1MWI (later redesignated monitoring well GT-3)and boring TB2 installed. <br /> 02/2511991:Prop 65 notification issued for diesel impact to groundwater. <br /> 01/14/1991:A new Notice of Reimbursement issued to James Gillies. <br /> 09/01/1994:Monitoring wells GT-1 and GT-2 installed. <br /> 08/16-19/1996:Soil boring GT-4 and monitoring wells GT-5 and GT-6 installed. <br /> 10/03-0411996:Soil borings GT-7 and GT-8,and monitoring well GT-9 installed. <br /> 03/19,22/1999:Monitoring well GT-10 and soil boring GT-11 installed. <br /> 07/20/1999:Record Title Owner letter issued to James Gillies. <br /> 10/29/2004-11104/2004:monitoring wells GT-12A,GT-13AIGT-13B(dual-completion),GT-14AIGT-14B(dual-completion),and GT-15A/GT-15B <br /> (dual-completion)were installed. <br /> 03/15/2005-3121/2005:monitoring wells GT-12B,GT-16A/GT-16B(dual-completion),GT-17A/GT-17B(dual-completion),GT-18A/GT-18B(dual- <br /> completion),GT-20,and GT-21 were installed. <br /> 08/08-09/2005:Soil borings GT-22 through GT-27 installed. <br /> 10/30/2006-10/31/2006:monitoring well GT-19 installed,and borings GT-28 and GT-29 were advanced. <br /> 10/31/2006-11/01/2006:monitoring wells GT-30,GT-31,GT-32,and GT-33 were installed. <br /> 08/21/2010:SVE Pilot test conducted. <br /> 05/2011-06/2011:full-scale Soil vapor extraction(SVE)pilot test was conducted.Six SVE wells were installed(Deep and Shallow variants of SVE- <br /> 1,SVE-2,SVE-3). <br /> 1212012:Remediation Feasibility Study And Corrective Action Plan(RFS&CAP)was submitted by consultant. <br /> 04/2013-05/2013:in response to RFS&CAP,the EHD evaluated and discussed the site with the CVRWQCB and it was agreed that the site is a <br /> candidate for case closure. <br /> ,, 9C_'T OP AT 1TI=T06077_.. 5/19/2015 <br />