Laserfiche WebLink
Samples will noed in this upper portion, but will be collected at 5-foot intervals between <br /> the depths 50 and 120 No water samples will be collected from the boring. After sampling, <br /> boring GP-11 wi be backfilled with grout. <br /> No sooner than 48 hours after the completion of GP-10, the elevation of the well cashig will be <br /> surveyed and the depth to groundwater will be measured in all wells. After purging, water samples <br /> will be collected from GP-10 and any,other wells in which the static water level is less than 10 feet <br /> over the screened interval. <br /> Although hydrocarbons at this site are primarily within the diesel range, low concentrations of <br /> gasoline have been detected in the soil in the vicinity of both GP-10 and GP-11. Gasoline and <br /> BTEX have seldom been detected in the groundwater, but both could be encountered in GP-10- <br /> Therefore, selected soil samples will be analyzed for both TPH-g and TPH-d, as well as for BTEX, <br /> and the groundwater sample from GP-10 will also be analyzed for these constituents. <br /> Upon completion of all field and laboratory work, a report will be prepared by a California <br /> registered geologist. The report will be include recommendations regarding fitture site <br /> investigations. <br /> 4.0 PROCEDURES <br /> 1)Notify San Joaquin EHD at least 48 hours prior to field work. <br /> 2)Drill two vertical borings to depths of 60 and 120 feet below grade using a hollow-stem auger <br /> drilling rig. <br /> 3) Collect discrete soil samples at 5-foot intervals, using a California modified split-spoon sampler <br /> loaded with three 6" brass sample sleeves. Continuously sample the shallow boring;from 35 <br /> to 60 feet. <br /> 4)Preserve the bottom sleeve by covering the ends with teflon sheets and plastic caps,and ship <br /> to McCampbell Analytical for analysis of TPH-g, TPH-d,and BTEX. <br /> 5) Screen the middle sample for the presence of organic vapors using a portable photo-ionization <br /> detector(PID)and record the measurement on the boring log. <br /> 6)Extrude the middle and upper sleeves and record the sample descriptions on the boring log in <br /> accordance with the Unified Soil Classification System. <br /> 7) Decontaminate the sampling equipment between samples. <br /> 8) Steam clean the drilling equipment between borings. <br /> 9)Place auger returns on visquine. <br />