4.0 FIRST RIVERBANK AQUIFER <br /> Isopach,potentiometric, and isocontour maps have been prepared and submitted for the <br /> first Riverbank aquifer in previous reports. The geometry of this sand body is well- <br /> controlled because all existing borings penetrated it. It trends east-west through the site, <br /> but may turn southward beyond the area of investigation. Groundwater in GT-6 and CPT- <br /> 3 is impacted, and it is evident that additional data points are needed to delineate-the <br /> eastern extent of contamination. Figure 4 shows three proposed wells for this purpose <br /> (GT-16, GT-20, and GT-21). Both GT-20 and GT-21 will probably be completed only in <br /> this aquifer, unless data from other wells indicate that dual completion ip the 2nd or 3`d <br /> Riverbank aquifers is needed to delineate the groundwater impact in those aquifers. <br /> Similarly, because diesel was detected at a concentration of 140 ppb in CPT-2, a well is +� <br /> needed to the north, nearer•the Gillies domestic well,(G-1). This well will be screened <br /> only in the lst Riverbank aquifer, but will be clustered with nested well GT-12 (screened 00�°{5`'�� G <br /> in the 2nd and 3`d aquifers, as described in sections 2.0 and 3.0). 1 <br /> Additional data points are required to define the extent of contamination south of GT-1 <br /> and GT-6 and west of GT-2 and GT-7. Wells GT-13, GT-17, and GT-19 will fulfill this <br /> purpose. GT-13 will be a nested well with a second completion in the 3`d Riverbank <br /> aquifer,and GT-17 will be nested with a well in the 2nd aquifer, but GT-19 will likely be <br /> completed only in the 1st aquifer. In total, 8 additional wells are proposed to meet the <br /> request of EHD for complete delineation of the extent of contamination in this aquifer. <br /> 5.0 SUMMARY <br /> In order to satisfy the requirements imposed in EHD's June 17, 2004 letter, Upgradient <br /> Environmental proposes to drill ten new borings and install nested monitoring wells. The <br /> first four wells(GT-12 through GT-15)will be installed in the 3`d Riverbank aquifer. <br /> Three of these will also be screened within the 2nd Riverbank aquifer, and the other will <br /> be screened in the 15`Riverbank aquifer. Soil,and water samples will be collected to <br /> determine whether the four wells in the 3`d aquifer are adequate to delineate the extent of <br /> impact in this aquifer. If so, the next three borings (GT-16 through GT-18)will be drilled <br /> through the 2"d Riverbank aquifer, and nested wells will be constructed in the 2"d and 1 st <br /> aquifers. After the results from these wells have been analyzed, the westernmost well <br /> (GT-19) and the two easternmost wells (GT-20 and GT-21)will be drilled. These will be <br /> completed only in the first aquifer, unless data from the previous wells indicate that these <br /> wells should also be screened in the 2"d or 3`d aquifers. In total, 18 new wells(8 in the 0 <br /> aquifer, 6 in the second aquifer, and 4 in the 3`d aquifer) are proposed. <br />