Laserfiche WebLink
• <br /> G a 1 i i Lis Tr uc F x tag <br /> Remediation Plan , <br /> Pate Z <br /> When the dart is certified clean by lab analysis , at will be <br /> placu?d back in the excavatic-1-1 Of haMICd cuff LAS fall dirt . <br /> In rogards to the exist -Lng contaminated seal on site , this <br /> will also be bio--r£em d 3.,Ated with the same culture as the so a 1 <br /> from re-e.,cavation, bUt this phask' will start as. Sr-Lon aS <br /> possible upon receipt of the appropriate permits . <br /> The time sc-hedUle is: <br /> A�-Lavazty TE stanq <br /> Fe--e Gavation ? Sc=mple I ab Analysis <br /> BILI lronoculata.c-rt <br /> . Bio 5rctwth 14 sample Lab Ana.iysas <br /> Bic, Fernediatac+n ' <br /> Complete 90 Sample Lab Analysis <br /> To tal 1 1 1 <br /> Acts Al dates will depend upon date of approval if You have <br /> any quustaons please call <br /> Sincerely , <br /> V"" ew Ca�--- <br /> nave McCain <br /> klm <br /> Eric Ic,sed <br /> i <br />