Laserfiche WebLink
• TABLE 2 cont'd Groundwater Elevation Measurements <br /> Project. Gillies Trucking <br /> Well Casing Depth to Screened Interval <br /> Well ID # Date Measured Elevation Groundwater Elevation H dro eolo is Unit <br /> GT-5 8/28196 2733 6537 -3804 50-75 feet, <br /> 10/7/96 6607 -3874 Modesto Aqu►tard, <br /> 12/11/96 6455 -3722 1st Riverbank Aquifer <br /> 11/21/97 6325 -6325 <br /> 4/28/98 4944 -21 11 <br /> 3/22/99 2734 46 15 -18 81 <br /> 4/9199 4635 -1901 <br /> 6/14/99 4850 -21 16 <br /> 10/5/99 55 16 -27 82 <br /> 12/22/99 53 70 -2636 <br /> 414/00 4640 -1906 <br /> 6/8100 2734 49 10 -21 76 <br /> 9114/00 5641 -2907 <br /> 12/19/00 5435 -2701 <br /> 3/7101 5306 -2572 <br /> 2122102 5706 -2972 <br /> 5129102 5881 -31 47 <br /> 1/2/03 6273 -3539 <br /> 3127103 6020 -3286 <br /> 615103 61 00 -33 66 <br /> 914/03 6573 -3839 <br /> 12/1103 6509 -3775 <br /> 7127/04 6738 -4004 <br /> 11/9104 2734 6952 -42 18 <br /> 3130105 6203 -3469 <br /> GT-6 8/28196 2671 6689 -38 54 50-75 feet, <br /> 1017/96 65 50 -3879 Modesto Aquitard, <br /> 12/11/96 63 83 -37 12 1 st Riverbank Aquifer <br /> 11/21/97 6258 -3587 <br /> 4/28198 4786 -21 15 <br /> 3/22199 2672 4555 -I8 83 <br /> 419/99 45 76 -1904 <br /> 6/14199 4760 -2088 <br /> 10/5199 5455 -2783 <br /> 12/22/99 53 12 -2640 <br /> 4/4/00 4583 -19 11 <br /> 618/00 4860 -21 88 <br /> 9/14/00 5583 -2911 <br /> 12/19/00 53 78 -2706 <br /> 317/01 5249 -2577 <br /> 2/22102 5647 -2975 <br /> 5/29102 5822 -31 50 <br /> 112/03 6203 -3531 <br /> 3/27103 5960 -3288 <br /> 6/5/03 6046 -3374 <br />