Laserfiche WebLink
TABLE 2 cont'd Groundwater Elevation Measurements <br /> Project- Gillies Trucking <br /> Well Casing Depth to Screened Interval <br /> Well LD# Date Measured Elevation Groundwater Elevation H dro eolo is Unit <br /> GT-10 3/27/03 >59 45 >-32 12 45-60 feet, <br /> 6/5/03 >59 45 >-32 12 Modesto Aquifer, <br /> 914103 >59 45 >-32 12 Modesto Aqurtard <br /> 12/1/03 >59 45 >-32 12 <br /> 7127104 >59 45 >-32 12 <br /> 11/9/04 >59 45 >-32 12 <br /> 3/30/05 >59 45 >-32 12 <br /> GT-12A 11/9/04 2775 6959 -41 84 85-105 feet, <br /> 3/30/05 6280 -3505 2nd Riverbank Aquifer, <br /> 2nd Riverbank A uttard <br /> GT-12B 3/30/05 2741 6225 -3484 1 15-125 feet, <br /> 2nd Riverbank Aquitaid, <br /> 3rd Riverbank Aquifer <br /> GT-13A 11/9/04 27 19 6915 -41 96 65-75 feet, <br /> 3/30/05 6267 -3548 1 st Riverbank Aquifer <br /> GT-13B 11/9/04 27 19 6895 -41 76 110-127 feet, <br /> 3/30/05 61 72 -34 53 3rd Riverbank Aquifer <br /> GT-14A 11/9/04 2655 6840 -41 85 80-90 feet, <br /> 3/30/05 6146 -3491 2nd Riverbank Aquifer <br /> GT-14B 11/9/04 26 45 6827 -41 82 105-115 feet, <br /> 3/30/05 61 12 -3467 3rd Riverbank Aquifer <br /> GT-15A 11/9104 2693 6879 -41 86 80-90 feet, <br /> 3130105 61 92 -3499 2nd Riverbank Aquifer <br /> GT-15B 11/9/04 2690 6864 -41 74 115-125 feet, <br /> 3/30/05 61 51 -3461 3rd Riverbank Aquifer <br /> GT-16A 3/30/05 27 17 6275 -35 58 60-70 feet, <br /> 1 st Riverbank Aquifer <br /> GT-16B 3/30/05 27 15 6522 -3807 80-90 feet, <br /> 2nd Riverbank Aquifer <br /> GT-17A 3/30105 2734 6263 -3529 60-70 feet, <br /> 1 st Riverbank A uifei <br /> GT-1713 3/30/05 2737 6243 -3506 80-90 feet, <br /> 1st Riverbank Aquitard, <br /> 2nd Riverbank Aquifer <br /> GT-18A 3130/05 2753 5900 -31 47 80-90 feet, <br /> 2nd Riverbank Aquifer, <br /> 2nd Riverbank A uitard <br /> i <br />