Laserfiche WebLink
PES Environmental, Inc. <br /> Ms. Emily Cushman <br /> November 24, 2015 <br /> Page 6 <br /> SCHEDULE <br /> The investigation will commence within two to three weeks of CVRWQCB's approval of the <br /> Work Plan depending on drilling subcontractor availability and obtaining drilling permits. It is <br /> anticipated that field activities associated with the proposed scope of work will be completed in <br /> two days. Soil and groundwater samples will be submitted promptly to the project laboratory <br /> for analysis following standard scheduling (five business days turnaround). The draft report <br /> will be provided to the CVRWQCB for review approximately three to four weeks following <br /> receipt of the analytical data. Should unexpected scheduling delays occur, PES will provide <br /> notification to CVRWQCB staff of the encountered delays and a revised schedule. <br /> We trust that this is the information you require at this time. <br /> If you have any questions or require additional information, please call (415) 899-1600. <br /> Very truly yours, <br /> PES ENVIRONMENTAL, INC. <br /> Gavin M. Creps, E.I.T. <br /> Senior Staff Engineer <br /> James P. unn, P.G. <br /> Principal logist <br /> Attachments: Plate 1 - Site Location Map <br /> Plate 2 - Proposed Soil and Groundwater Borings <br /> cc: Mr. Howard Weinberg <br /> 148400101W003.doex <br />