Laserfiche WebLink
Stockton Cineplex Site <br /> Work plan for Preliminary Risk Assessment and Contaminant Mitigation <br /> Page: 7 <br /> and use in the evaluation of a release if a release is discovered during the construction <br /> Stockton Cineplex project. <br /> If underground tanks or other contamination are discovered during the construction <br /> activities, the San Joaquin County Public Health Service - Environmental Health Division <br /> will be immediately notified and the appropriate work plan and or permit applications <br /> submitted for underground storage tank removal or other clean up activities. <br /> Construction of the conceptual site model and the risk assessment modeling will be <br /> conducted under the direction of a California licensed Geologist and Certified <br /> Hydrogeologist <br /> Prepared by: <br /> tiD GF�� <br /> \c,� G�pITIF/FU OC <br /> W ROBERT FOURT <br /> cc <br /> No.18 <br /> Robert Fourt, CHG (P p �����• <br /> California Certified Hydrogeologist # 180 9 o G Q• <br /> FGF <br /> r �,,• KL <br /> Michael J. Kloberdanz' REA, RE <br /> California Registered Environ ntal Assessor#02157 r f k <br /> California Registered Environmental Health Specialist#4783 X157 <br /> Expires:C'30—Ot <br /> 7j�0 fo� <br />