My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:19:48 AM
Creation date
4/10/2020 8:44:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY GROUNDWATER SAMPLING(05/02/91)RESULTS: (ug/L) <br /> Well Ethyl- TPH Historical <br /> No. Benzene Toluene benzene Xylenes Gasoline Trend <br /> RW4 16,000 34,000 4,200 22,000 110,000 Decreased <br /> IW1 150 25 230 520 2,500 Unchanged <br /> P1 340 5 430 520 3,700 NA <br /> P2 140 13 650 610 5,400 NA <br /> V1 20,000 49,000 4,700 25,000 130,000 NA <br /> V3 1,900 30,000 5,200 26,000 110,000 NA <br /> V4 31,000 58,000 5,700 29,000 200,000 NA <br /> FREE PHASE PRODUCT RECOVERY SUMMARY: <br /> Product recovered this quarter: NA <br /> Cumulative product recovered: NA <br /> WORK TO BE PERFORMED NEXT QUARTER: <br /> Groundwater will be sampled, and the samples will be analyzed for petroleum hydrocarbons. <br /> August 1991 <br /> The permits to install and operate a combined soil vapor and groundwater extraction system <br /> will be acquired. The design of the system will be modified to be built in and around a <br /> building proposed for the site. Construction of the system will proceed as permits are acquired <br /> and when an agreement with the land owners is reached concerning construction on the site. <br /> August 1991 <br /> WORK TO BE PERFORMED NEXT 12 MONTHS: <br /> Regular monitoring and sampling will continue. <br /> The combined soil vapor and groundwater extraction and treatment systems will be installed, <br /> constructed, and operated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.