My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:19:48 AM
Creation date
4/10/2020 8:44:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Antonia Vorster -2- 28 October 1981 <br /> 3. The report recommends that since the source nor the extent of the plume is <br /> known, no immediate cleanup is required. It further states: "if reqaired, a <br /> Problem Assessment Report should determine the source and extent of contamina- <br /> tion." <br /> The objective of this report should be to identify the entire problem and to <br /> propose mitigation measures to eliminate the problem. The Site Assessment <br /> Report has failed to meet these objectives. Therefore, a "Problem Assessment <br /> Report" is required. <br /> 4. The report states that there is no threat to existing or potential water <br /> supplies. The separation of the upper and lower water bearing zones has not <br /> been shown nor has the extent of the plume been determined. This conclusion <br /> has no merit. <br /> 5. The report recommends that further on-site monitoring wells are not necessary. <br /> This recommendation may be true only to the extent that the monitoring wells <br /> needed downgradient, will have to be located off-site to fully define the <br /> plume. <br /> In conclusion, this Site Assessment Report has not met the objectives of such <br /> a report. It has failed to delineate the extent of the plume. The contention <br /> that the source is from an upgradient source, is so far totally unsubstan- <br /> tiated. <br /> Additional site assessment work (i .e. , problem assessment) should meet the <br /> following objectives: <br /> a. The vertical and horizontal extent of the contamination should be identi- <br /> fied. <br /> b. Cleanup alternatives should be considered and a best alternative should be <br /> selected. <br /> c. A time schedule should be included for the implementation of the remedial <br /> action phase of the project. <br /> DLB:ej <br />
The URL can be used to link to this page
Your browser does not support the video tag.