My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:19:48 AM
Creation date
4/10/2020 8:44:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br /> PETE WILSON, Governor <br /> STATE OF CALIFORNIA <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD, SUITE A 465, 0,00N <br /> SACRAMENTO, CA 95827-3098 <br /> PHONE: (916) 361-5600 <br /> FAX: (916) 361-5686 <br /> 31 May 1991 ry <br /> JUN 6 1991 <br /> ENVIRONMENTAL HEALTH <br /> PF,RMIT/SERVICES <br /> Mr. Harlin Knoll <br /> San Joaquin County Public <br /> Health Services <br /> P. 0. Box 2009 <br /> Stockton, CA 95202 <br /> REVIEW OF COMBINED WORK PLAN TO REMEDIATE SOIL AND GROUNDWATER FOR EXXON - <br /> 4444 NORTH PERSHING AVENUE - STOCKTON, SAN JOAQUIN COUNTY <br /> Below is a staff review of Exxon's Combined Work Plan for the remediation of <br /> the soil and groundwater. The following comments should be incorporated with <br /> your correspondence: <br /> 1 . We have reviewed the Combined Work Plan dated 8 November 1990. Your plan <br /> to pump and treat the groundwater and establish a hydraulic barrier <br /> between your site and the upgradient Shell station is acceptable. <br /> However, it has been our experience that hydraulic barriers are difficult <br /> to produce in practice. We recommend that you develop a contingency plan <br /> if your barrier does not prevent the Shell plume from entering your <br /> extraction sphere of influence. <br /> 2. The proposed vapor extraction system planned for the site is also <br /> acceptable. <br /> 3. Exxon is to submit a time schedule for installation of each phase of <br /> remediation and when operation is planned to begirt. The time schedule is <br /> due by 1 July 1991. <br /> If you have any questions, please call me at (916) 361-5723. <br /> B. MAUGHAN <br /> Water Resource Control Engineer <br /> JBM:jbm <br />
The URL can be used to link to this page
Your browser does not support the video tag.