My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:11:17 AM
Creation date
4/10/2020 9:08:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r r r r r r r r r r r r r r r r 1 1 <br /> TABLE I WELL CONSTRUCTION DETAILS,FORMER EXXON RS 7-3942,4444 NORTH PERSHING AVENUE STOCKTON CALIFORNIA <br /> Well Elevation Total Well Borehole Casing Screened Slot Filter Pack <br /> Well Installation TOC Casing Depth Depth Diameter Diameter Interval Size Interval Filter Pack <br /> Number Date (feet) Material (feet) (feet) (inches) (inches) (feet) (inches) (feet) Material <br /> IP2B 09/21/04 SS 40 36.5 8.25 0.75 33-36 0.01 32.5-36.5 #2/12 sand <br /> (30.5-32.56) <br /> (24-28.5) <br /> IP3A 09/22/04 SS 40 31.5 8.25 0.50 29.5-30.5 0.02 29-31.5 #3 sand <br /> (26-29) <br /> IP3B 09/22/04 SS 40 39 8.25 0.75 35-38 0.01 34-39 #2/12 sand <br /> (34-356) <br /> (26-296) <br /> a Well surveyed in October 2001. Vertical datum is based on City of Stockton Benchmark#265,a chiseled cross on the sidewalk on the east side of <br /> Pershing Avenue,south of March Lane on E.B.M.U.D.easement. <br /> b Bentonite seal. <br /> PVC Polyvinyl chloride. <br /> TOC Top of casing. <br /> SS Stainless steel. <br /> • The UVB well has two screen intervals separated by a bentonite seal.The screen and filter pack intervals are listed above. <br /> -- Information not known. <br /> Note:IPIA and IP113,IP2A and IP2B,and IP3A and IP313 are nested wells. <br /> g9projedaV3942\pub1ic\wel1 cooawetion\3942welldeleila.xlx Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.